Download presentation
Presentation is loading. Please wait.
Published byDebra Grant Modified over 9 years ago
1
EV CONTAINER CORPORATION - REVOLUTIONIZING THE BEVERAGE INDUSTRY Copyright @ EV Container Corporation EV EVkeg Purge & Fill for Brewers
2
EVKeg Purge – seal check & liner deployment - Set up a line with a resitance valve on the coupler outlet as shown - Open the keg valve and purge the keg Copyright @ EV Container Corporation
3
EVKeg Purge – seal check & liner deployment - Shut the outlet valve. The back pressure build up will open the liner in the keg - Once the liner is deployed, pressure will rise in the keg to the regulator set pressure - Shut off the cylinder valve. If the keg holds pressure the fitment seal is functional Copyright @ EV Container Corporation
4
EVKeg Purge – seal check & liner deployment - If pressure is lost, carefully remove the handle and reset the fitment seal Copyright @ EV Container Corporation
5
EVKeg Fill - Shut off the keg valve to hold the CO2 in the keg - Connect the fill coupler with a resistance valve and open the valve - Maintain a small back pressure on the outlet to ensure the liner remains deployed during filling Copyright @ EV Container Corporation
6
EVKeg Fill - When the liner is deployed and fully supported by the keg walls, the keg can be pressurized to the full operating pressure of 45PSI. Copyright @ EV Container Corporation
7
EVkeg – contact us www.evcontainer.com EV Container Corporation 2148 Beechcraft Road Unit 300 Vacaville CA 95688 415-460-5341 Copyright @ EV Container Corporation
8
EVkeg – made in the USA Thank you Copyright @ EV Container Corporation
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.