May 3, 2015
3
We Are All In! We are stepping out in faith There is a plan to obtain needed funding There will be no “part way” The final timeframe and the final building size still remain to be determined based on fundraising progress
4
Building Size and Cost Building costs estimated using professional estimation methods Costs include the building itself, site preparation, and a contingency fund Congregation could achieve all current functions and missions in ~13,500 ft 2 Minimum total cost is ~$2.7M
5
Financial Plan – $2.7M Assumptions Conservative estimates throughout No change in congregational size Current giving must be able to fund new mortgage payment Not everybody turned in a Consideration Card Fundraising will occur over a 3 year period
6
Financial Plan – $2.7M
7
$315,000 Required in Fundraising Above the Consideration Cards (returned and unreturned) Represents a significant challenge Can be achieved How will we get there?
8
Fundraising Plan It’s all about you! It’s not all about giving financially! Over The Top Giving! Additional Considerations / Commitments Anything over our Budget Special gifts to achieve specific goals Events Ideas from you!
9
Fundraising Plan Other ways to achieve the goal Extending fundraising period Increased mortgage amount Bonds (as a last resort)
10
Next Steps Turning Considerations into Commitments Fulfill the Commitment Finish the Building Design Begin City / County Planning and Approvals Break Ground