PARAMBIKULAM ALIYAR PROJECT ( P.A.P ALIYAR BASIN ) ( an overview )

Similar presentations


Presentation on theme: "PARAMBIKULAM ALIYAR PROJECT ( P.A.P ALIYAR BASIN ) ( an overview )"— Presentation transcript:

1 PARAMBIKULAM ALIYAR PROJECT ( P.A.P ALIYAR BASIN ) ( an overview )
W E L C O M E PARAMBIKULAM ALIYAR PROJECT ( P.A.P ALIYAR BASIN ) ( an overview ) Presentation by A.K Chinnaswamy B.Sc agri Chairman PAP Aliyar Basin

2 PARAMBIKULAM ALIYAR BASIN

3 PARAMBIKULAM ALIYAR PROJECT ( P. A. P )
INTERTSATE PROJECT / T.N & KERALA MULTI-VALLEY, MULTI-PURPOSE DIVERSION OF WEST FLOWING WATERS TO THE EAST SIDE

4 PARAMBIKULAM ALIYAR PROJECT ( P. A. P )
Irrigation Power generation Domestic & Industrial water supply Aquaculture Recreation / Tourism

5 Inter-State Agreement TAMILNADU & KERALA
FINAL AGREEMENT ON WITH RETROSPECTIVE EFFECT FROM

6

7

8 ALIYAR DAM

9 PARAMBIKULAM ALIYAR BASIN
SUB – BASIN TAMILNADU OLD COMMAND Ha NEW COMMAND Ha TOTAL Ha

10 ALIYAR RESERVOIR

11 VETTAIKARANPUDUR CANAL POLLACHI CANAL

12 ALIYAR SUB BASIN

13 NEW – 1ST SEPT. TO 15TH JANUARY
IRRIGATION SEASON ALIYAR SUB BASIN OLD – 16TH MAY TO 15TH APRIL NEW – 1ST SEPT. TO 15TH JANUARY

14 IRRIGATION PATTERN – ALIYAR SUB BASIN
YEAR SEASON (JAN – MAY) FIRST YEAR ZONE A ( 50% AREA ) SECOND YEAR ZONE B ( 50% AREA)

15 ALTERNATE SLUICE METHOD OF IRRIGATION

16 PARAMBIKULAM ALIYAR PROJECT
PROJECT COMMITTEE FOR ALIYAR SUB BASIN DISTRIBUTORY COMMITTEE : 4 NOS WUA : 21 NOS

17 Contour canal

18 CROPPING PATTERN In alliyar basin major crop is coconut plantation. Covered more than 85 percent of the area. Paddy, sugarcane, and groundnut can also be grown in the remaining areas.

19 Requirments of w.u.a The following amenities should be provided for strenthening the water users association. Enough finance should be provided for cleaning and maintance of canals under the control w.u.a’s. Facilities like office computer and staffs should be alloted for effiecent running of the water users association. The vehicle should be alloted at the time of irrigation period for inspection of canals to facilitate for supply of water till the tailends and also to prevent water theft in canals

20 Thank you