Presentation is loading. Please wait.

Presentation is loading. Please wait.

Close Call System 2.2 Webinar Jennifer Fox CCS Trainer RSSB.

Similar presentations


Presentation on theme: "Close Call System 2.2 Webinar Jennifer Fox CCS Trainer RSSB."— Presentation transcript:

1 Close Call System 2.2 Webinar Jennifer Fox CCS Trainer RSSB

2  Reporting a Close Call Event  CCS 2.2 Project  Network Rail’s Life Saving Rules  Requesting System Enhancements  Overview of System Changes  Start Centre  Close Call Event screen  Responsible Manager responsibilities

3 Use of Close Call system for Network Rail / Contractors Report via the Network Rail Close Call process. Call: 01908 723 500 Log via NR Close Call app (not currently available to contractors) Report via the contractor Close Call process Details should be given in site induction – if in doubt, speak to your supervisor I’m working on railway infrastructure, in a Network Rail building, or travelling on Network Rail business. I’m working on railway infrastructure managed by a Principal Contractor.

4 Changes made under CCS 2.2 Project  Start Centre Portlets  Additional tick box in the Close Call Event Description field  New tab – Network Rails Lifesaving Rules  RM review notification email content  Bulk Upload Spreadsheet

5 Life Saving Rules

6

7

8 http://www.safety.networkrail.co.uk/Commitment-and-Rules/Lifesaving-Rules

9 Contact for user enhancement requests Email closecall.enquiry@rssb.co.uk Ongoing programme of work for system enhancements.


Download ppt "Close Call System 2.2 Webinar Jennifer Fox CCS Trainer RSSB."

Similar presentations


Ads by Google