Download presentation
Presentation is loading. Please wait.
Published byLeo Briggs Modified over 9 years ago
1
Lyons and Sandwell, JGR, 2003 Landers EQ Hector Mine EQ
2
http://topex.ucsd.edu/gmtsar
4
forming interferogram
7
phase due to curved earth phase due to topography Perpendicular baseline MATTERS!
8
total phase
9
Phase from curved Earth
10
total phase
11
Critical Baseline
12
Phase from topography
13
phase minus spherical earth
14
How high is Toro Peak?
15
deformation and topography
18
Triggered slip on Southern San Andreas Fault
19
Need for Precise Orbits 1. proper focus 2. transform from geographic radar coordinates 3. image alignment 4. flattening interferogram Brute force algorithm given precise orbit subroutine pick target point fly satellite along orbit and identify point of closest approach (This is inefficient but computers are fast so don’t waste time coding.)
21
GMTSAR 2-pass processing no ground control seamless abutment of frames along track stacking for time series one master and many slaves primary, secondary, tertiary, image alignment ScanSAR Interferometry possible but not easy code needs refinement
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.