NR - ULDC SCHEME POINTS OF CONCERN.  1. LACK OF REDUNDANCY  2. FREQUENT BUGS IN SCADA SOFTWARE  3. INCOMPLETE REPORTING SYSTEM  4. EMS – INCOMPATIBLE.

Similar presentations


Presentation on theme: "NR - ULDC SCHEME POINTS OF CONCERN.  1. LACK OF REDUNDANCY  2. FREQUENT BUGS IN SCADA SOFTWARE  3. INCOMPLETE REPORTING SYSTEM  4. EMS – INCOMPATIBLE."— Presentation transcript:

1 NR - ULDC SCHEME POINTS OF CONCERN

2  1. LACK OF REDUNDANCY  2. FREQUENT BUGS IN SCADA SOFTWARE  3. INCOMPLETE REPORTING SYSTEM  4. EMS – INCOMPATIBLE PACKAGES  6. SOME IMPORTANT PROJECT SPECIFIC WORKS STILL PENDING  5. PROLONGED DATA INTERRUPTIONS DUE TO POWER SUPPLY PROBLEMS

3 RTUs SUBLDC DS SLDC ICCP RSCC ICCP RSCC DS SLDC OPERATOR CONSOLE SLDC DS SLDC ICCP SLDC DS RTUs SUBLDC DS RTUs CPCC RTUs CS RTUs REPORTING TO RSCC DATA OF CS & OTHER SLDCs RTUS REPORTING TO SLDC RTUs REPORTING TO RSCC Data flow in ULDC scheme RTUs REPORTING TO SLDC RSCC OPERATOR CONSOLE SLDC OPERATOR CONSOLE

4

5 PANIPAT MURADNAGAR DADRI - HVDC BALLABGARH BADARPUR OKHLA MALVIYANAGAR MEHRAULI VASANT KUNJ SONEPAT BAWANA PATPARGANJ IP EXT SARITA VIHAR J & K, PUNJAB, BBMB, HPSEB UPSEB J & K, PUNJAB,BBMB,HPSEB MAIN DATA S/B DATA UP SEB MAIN DATA S/B DATA DELHI MAIN DATA S/B DATA NARELA-JHANGIRPURI- GOPALPUR-WAZIRABAD KANJHAWALA NAJAFGARH RSCC A BAMNAULI RAJESTHAN MAIN STD BY

6 CRITICAL STATION AFFECTING COMMUNICATION LINK FROM SLDCs TO RSCC u MOST CRITICAL STATION AFFECTING ALL MAIN & STANDBY DATA OF ALL SLDCs : BADARPUR u SECOND MOST CRITICAL STATION AFFECTING MAIN DATA OF ALL SLDCs : MURADNAGAR-I u : DADRI HVDC u :BALLABGARH u OUTAGE OF PANIPAT & DHULKOTE WILL ALSO AFFECT main and standby of ALL SLDCs EXCEPT UP & RAJASTHAN

7 SCADA Problems u CFE hanging frequently at many locations resulting into loss of RTU u Frequent failure of Applications resulting into failure of DATA SERVERS. Interruption of data and loss of HIM data. u In HDR different values at the same time point with change of sample rate u In HIM Frequent crashing of Oracle, reset of juke box,long term storage of Data u Reports for MIN,MAX,Avg still not available

8 SCADA Problems (continued) u LAN problem u Shortcoming in trending functions ( scale, tabular etc.) u Frequent tripping of UPS especially at SUBLDC level.

9 EMS PROBLEMS- RESOURCE SCHEDULING & COMMITMENT (RSC) u Scheduling Philosophy 15 minutes block instead of hourly. u Regional and Inter-regional bi-lateral not covered u Desired treatment of Hydro station not provided u Share/Entitlement not provided as per requirement u Unit wise scheduling instead of Plant wise u No provision of Regional and inter-regional losses.

10 EMS NETWORK APPLICATIONS (State Estimation,Contingency Analysis,Security Enhancement) u Non-Availability of Complete Status of CBs and Isolators through Telemetry. u Non-Availability of complete Generator data such as capability curve etc. Database modelled with typical generators.

11 DTS -Application DTS – PROBLEM UNABLE TO INITIALISE FROM REAL TIME

12

13 Recent Problem u Data is being interrupted in case of outage of standby Links in spite of availabIlity of Main links. u E.g Outage of sarita Vihar (07.11.03) and Wazirabad (12.11.03) u Testing was carried out on 11.11.03 by manualy switching of MCB at Sarita Vihar.

14 RTU Reporting Status 1.Total RTUs-366 2. RTUs Integrated-333 3. RTUs Reporting- 275 BEMINA SUBLDC HAVING 8 RTUs NOT INTEGRATED.

15 Pending important Analog points u 1 Gross unit generation data for Badarpur,Singrauli, Unchahar not available. u 2 Unit generation data of Dadri-Gas, Anta,Chamera and Auriya not available. u 3 Few line/ICT flows not available.

16 Pending important Digital points u 1. NTPC- AURIYA, BADARPUR,DADRI-GAS u 2. POWERGRID- SOME POINTS PENDING. u 3. DTL- 50 % PENDING u 4. UPPCL- 30 % PENDING u 5. RVPNL- 20 % PENDING

17 PLCC LINK PROBLEM u 1. EITHER MAIN OR STAND BY LINK FOR AGRA, ALLAHABAD, FARIDABAD –PP, MEERUT, VINDHYACHAL,ABDULLAPUR, MALERKOTLA, NALLAGARH AND SRINAGAR NOT WORKING. u 2. EITHER MAIN OR STANDBY LINK FOR SALAL, BAIRASUIL, CHAMERA, URI, ANTA,AURIYA, UNCHAHAR, NARORA AND RAPP NOT WORKING.