II Meeting of the Monitoring Committee of OP “Transport and Transport infrastructure” 2014-2020 3 June 2015 Pravets
2
1 887 587 256 METRO 402 million € Intermodality 24 million € RAILWAY INFRASRUCTURE 673 million € INNOVATIONS IN MANAGEMENT AND SERVICES 68 million € ROAD INFRASTRUCTURE 673 million € * Innovations in management and services Development of systems for railway traffic management (GSM-R) Development of information systems for automobile traffic management Improvement of quality of aeronautical data and information in the area of civil aviation Development of navigation information systems, upgrading the existing systems and the systems under construction, supply of multipurpose vessels; (ISТS by sea)
3
1.Plovdiv – Bourgas – Phase ІІ (ing. Railway Plovdiv and Railway Bourgas) 2.Elin Pelin – Septemvri 3.Struma MW, Lot3 “Blagoevgrad - Sandanski” 4.Hemus MW - from Yablanitsa to Veliko Turnovo“ 5.Tunnel under Mount Shipka PRIORITY PROJECTS 2014-2020 RAILWAY AND ROAD INFRASTRUCTURE 1. 2.2. 4.4. 5.
4
PRIORITY PROJECTS 2014 – 2020 г.(1) Railway Infrastructure Project: Rehabilitation and modernization of the railway line Plovdiv - Burgas Phase 2, incl. Plovdiv and Burgas railway junctions (for speed of 130 km), with a length of 100 km Indicative budget: 320 million euro Project: Modernization of Stara Zagora, Nova Zagora, Yambol and Karnobat railway stations Project: Modernization of the railway line Elin Pelin - Ihtiman - Septemvri (for speed of 160 km), with total length of 78 km Indicative budget: 740 million euro Railway projects are complemented with investments under CEF (Sofia - Elin Pelin; part of the railway junction Sofia; Sofia – Dragoman; Vidin - Medkovets) Intermodality for passengers and freight and sustainable urban transport Project: Construction of Line 3 of the Sofia metro: Stage I (section 2) "Botevgradsko Road (Vladimir Vazov blvd.) - Center – “Ovcha Kupel “ (str. Zhitnitsa)" Indicative budget: 434 million euro Project: Extension of Line 2 of the Sofia Mmetro: Metro station “James Boucher” (MS II-11) to “Hladilnika” district, Metro station Vitosha (MS II-12) Indicative budget: 21.6 million euro Intermodal terminals - Ruse, Vidin II Meeting of OP “Transport and transport infrastructure” 2014-2020 Monitoring Committee
5
PRIORITY PROJECTS 2014 – 2020 г.(2) Road infrastructure Project: Construction of the "Struma" MW, Lot 3 Construction of motorway section with an apprx. length of 62 km (Lot 3.1 from Blagoevgrad to Krupnik; Lot 3.2 from Krupnik to Kresna; Lot 3.3 from Kresna to Sandanski) Indicative value: 750 million euro Project: Construction of the "Hemus" MW Stage 1 – from "Hemus" MW (Yablanica) to road II-35 (Pleven-Lovech) - 60 km; Stage 2 - from road II-35 to road E85 (Ruse – Veliko Tarnovo) - 85 km Indicative value (Stage 1 and Stage 2): 445 million euro Project: Construction of a tunnel under the "Shipka“ Peak (Phase 2 of the project “Gabrovo bypass“) II Meeting of OP “Transport and transport infrastructure” 2014-2020 Monitoring Committee
6
Started projects OP TTI 2014 - 2020 Struma MW Lot 3 - Lot 3.1 Blagoevgrad - Krupnik (13 km) - Lot 3.3 Kresna - Sandanski (24 km) Indicative total budget: 185 million euro Hemus MW -Stage 1 - from "Hemus" (Yablanica) to road II-35 (Pleven-Lovech) (60 km) Indicative total budget: 217 million Euro Extension of the Metro in Sofia -Construction of Line 3 of the metro in Sofia: Stage I (section 2) "Botevgradsko shosse” (Vladimir Vazov blvd.) - Center city area – Ovcha Kupel (str. Zhitnitsa)“ - 255 million Euro -Extension of Line 2 of the Sofia Mmetro: Metro station “James Boucher” (MS II- 11) to “Hladilnika” district, Metro station Vitosha (MS II-12) - 22 million euro In the pipeline is the tender documentation for the rehabilitation of the sections Skutare (Plovdiv) -Orizovo and Straldzha - Tserkovski, project Plovdiv - Burgas, Phase2 II Meeting of OP “Transport and transport infrastructure” 2014-2020 Monitoring Committee
7
Implementation of preliminary conditions for the Transport Plan Development of Integrated Transport Strategy (ITS) ITS is a basis for planning transport projects earmarked for funding from: ERDF and CF; The Connecting Europe; State budget; other international financing institutions, public-private partnerships, private finance initiatives, etc. In developing the ITS will be used: Road Strategy developed by the World Bank Draft Strategy for development of railway transport in Bulgaria Create an Unit to support the work of the Consultant - specialists in modeling and modal transport NSI will assist MTITC in collecting the necessary information. II Meeting of OP “Transport and transport infrastructure” 2014-2020 Monitoring Committee
8
Actions in Comprehensive Transport Plan Reports Scope Signing September 1 Signing October 1 Inception Report Technical Assistance, Data Collection studies; Draft National Transport Model 28.09.201528.10.2015 Report №1 Data Collection Undertake. Report on the scope of the model 14.12.201514.01.2016 Report № 2 Results of the analysis 25.03.2016 22.04.2016 Report № 3 Objectives and measures 06.06.2016 06.07.2016 Report № 4 Administrative capacity assessment 11.07.2016 11.08.2016 Report № 5 Comprehensive Transport Plan; Manual for use of the model 29.08.201629.09.2016 Report № 6 Draft Final Report of the Integrated Transport Strategy until 2030 29.08.2016 29.09.2016 Report №7 Strategic Environmental Assessment 17.10.2016 17.11.2016 Final Final report 24.10.2016 24.11.2016 Approval of the final report 21.11.201622.12.2016
9
Thank you for attention!