Copyright 2012 - Green Revolution Cooling
Oil Immersion Cooling Case Studies of Two Oil and Gas Data Centers Christiaan Best Copyright Green Revolution Cooling
2
Copyright 2012 - Green Revolution Cooling
The CarnotJet™ System Any OEM Server CarnotJet™ 42U Rack Heat Flow Vertically mounted OEM server Ethernet cable guides 30° – 53° C Water Outside Inside CarnotJet Pump module Power cable guides CarnotJet™ Rack PDU Mount Servers Liquid fill line Install any standard OEM rack server » Any brand » CPU and GPU compatible » Fiber compatible Submerge into ElectroSafe™ coolant » Captures 100% of heat » Requires no air cooling Intelligent control system » Heat expelled outside » Alerts/monitoring software Copyright Green Revolution Cooling
3
Copyright 2012 - Green Revolution Cooling
Disclaimer Information about installations are restricted under NDA. The format of this presentation is a quote by a customer, followed by GRC’s explanation of why this particular benefit is possible. GRC explanations use generic data. Copyright Green Revolution Cooling
4
Copyright 2012 - Green Revolution Cooling
Case study 1: CGG Date first publicized: 2012 Size of installation: confidential (but growing) Copyright Green Revolution Cooling
5
Copyright 2012 - Green Revolution Cooling
Power Savings “What we are seeing is a significant saving in terms of electricity. I would say it’s not impossible to go up to a factor of two [power allocated to servers in a given data center]” Laurent Clerc, VP of Information Technology Copyright Green Revolution Cooling
6
Power Savings Example Typical Installation Savings
This slide needs to be fixed and improved mPUE < 1.03, any climate Copyright Green Revolution Cooling
7
Copyright 2012 - Green Revolution Cooling
Retrofit Savings “We saturated the power envelope of this room by putting twice as many systems as we would normally have, if it had a normal way of cooling systems.” Laurent Clerc, VP of Information Technology Copyright Green Revolution Cooling
8
Example Power Infrastructure
Average Power Equipment sizing (since peak is higher than average) Conventional Highly Efficient Air GRC Server Power 1 MW .85 MW Air handler / GRC .2 MW .1 MW .04 MW “Other” .5 MW .25 MW .09 MW Total 1.7 MW 1.35 MW .98 MW Make the formatting of both tables identical Battery Backup 1.0M 1.0 MW .85M Room Power distribution 1.2M 1.1 MW Generator 1.9M 1.45M 1.02M Copyright Green Revolution Cooling
9
How to Nearly Double Your Data Center Server Capacity
Retrofit with GRC Servers take ½ the floor space Reallocate MEP power to servers (add battery backup if necessary) Add 80% more servers into the same data center Copyright Green Revolution Cooling
10
Data Center Operations
“Today there is not really much difference between managing this room [with the CarnotJet” and managing another traditional air based computer.… there’s no noise, almost no noise, the temperature is very reasonable, there’s no air draft, … makes for a much nicer environment overall Laurent Clerc, VP of Information Technology Copyright Green Revolution Cooling
11
Copyright 2012 - Green Revolution Cooling
Operations video removing server per rack Deployed on 4 continents Some of the world’s biggest data center operators All of the “check boxes” filled Everything from data center labor unions to building code to seismic reinforcement Copyright Green Revolution Cooling
12
Copyright 2012 - Green Revolution Cooling
Start date: 2014 Size: 8 PFLOPS and growing Case Study 2 Copyright Green Revolution Cooling
13
Copyright 2012 - Green Revolution Cooling
Efficiency “The GRC system is reducing our cooling energy consumption by up to 90%, bringing down our total energy cost by around 35%.” Dr. Stuart Midgley, CTO Copyright Green Revolution Cooling
14
Copyright 2012 - Green Revolution Cooling
Reliability “Any disruption to our data processing can delay client projects worth millions of dollars. That is why we choose the Green Revolution Cooling system.” “The CarnotJet system has proven to be exceptionally reliable and is helping reduce the frequency of failures.” Dr Stuart Midgley, CTO Copyright Green Revolution Cooling
15
A More Reliable Cooling System
Integrated, prepackaged cooling system State of the art monitoring and controls Precisely engineered with guaranteed capacity Average more than % uptime Inherently reliable architecture Very simple system One moving part inside the data center for every 100 kW of power Copyright Green Revolution Cooling
16
Copyright 2012 - Green Revolution Cooling
More Reliable Servers No hot spots & limitless rack power density More than 100 kW per rack +/- 3 C, data center wide Improved electrical connector reliability No fans Many other reasons Copyright Green Revolution Cooling
17
Copyright 2012 - Green Revolution Cooling
A Quick Summary ½ the power Almost 2x the number of servers in your current facility More reliable cooling More reliable servers Copyright Green Revolution Cooling
18
A Select List of Other Customers
Global Telecom [Redacted] [one of the world’s largest ] [one of world’s largest telecoms ] [In Top 10 of most powerful computing centers] [In Top 10 of most powerful computing centers] [In Top 100 of most powerful computing centers]
19
For those serious about reducing data center cost
Unmatched efficiency. Unmatched capital savings. Unmatched simplicity. For those serious about reducing data center cost Christiaan Best, CEO c o Copyright Green Revolution Cooling
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.