1 1 Bloomingdale Special Taxing District March 9, 2015 Property Management Report

2 2 Completed February Landscaping Spot Treatment Turf Weeds Spot Treatment Turf Weeds Fig Pruning Continued Fig Pruning Continued Shrub Detail & Pruning, Including Round-Up weed spraying Shrub Detail & Pruning, Including Round-Up weed spraying Natural Area Cutbacks Continue Natural Area Cutbacks Continue Ant Mounds Treated Ant Mounds Treated Spot Treatment Bed Weeds Spot Treatment Bed Weeds

3 3 Planned March Landscaping Fertilization of All District Turf Fertilization of All District Turf Spot Treat for Turf Insect Control Spot Treat for Turf Insect Control Spot Treatments for Turf Weeds Spot Treatments for Turf Weeds Spray Plant Beds for Weed Control Spray Plant Beds for Weed Control Continue Shrub Trimming Continue Shrub Trimming Additional Spot Chinch Bug Applications Additional Spot Chinch Bug Applications Annual Natural Area Cutbacks Continued Annual Natural Area Cutbacks Continued Continue Fig Pruning Continue Fig Pruning

4 Fig Replacements – Fig Replacements – 2,187 plants at $5.50 each $12,028.50 2,187 plants at $5.50 each $12,028.50 Plant Replacements – Plant Replacements – 264 1 gallon plants at $6.00 each 1,584.00 264 1 gallon plants at $6.00 each 1,584.00 2,195 3 gallon plants at $17.00 each 37,315.00 2,195 3 gallon plants at $17.00 each 37,315.00 Sod Replacements – Sod Replacements – 33,270 square feet at $.65 / sq ft 21,625.00 33,270 square feet at $.65 / sq ft 21,625.00 Two Oak Tree Replacements – Remove/ Grind/Replace/Irrigate - $2,770.00ea 5,540.00 Two Oak Tree Replacements – Remove/ Grind/Replace/Irrigate - $2,770.00ea 5,540.00 Total Estimated 2015 Replacement $78,092.50 Total Estimated 2015 Replacement $78,092.50 4 2015 Estimated BSTD Replacement Plant Material Costs

5 Accident Wall Repaired/Painted/Figged 5

6 Springvale Painting at Pine Grove 6