Presentation is loading. Please wait.

Presentation is loading. Please wait.

Map-Works 2011 A First-Year Retention Initiative 1.

Similar presentations


Presentation on theme: "Map-Works 2011 A First-Year Retention Initiative 1."— Presentation transcript:

1 Map-Works 2011 A First-Year Retention Initiative 1

2 Fall to Fall Retention First-Time Full-Time Freshmen HLC: “Resident retention is too low for a population with a 3.4 high school GPA and average ACT composite of 23-24. The University needs to address its retention issue and identify its cause(s)” 2

3 MAP-Works Educational Benchmarking INC (EBI) Founded 1984 -UW partnership since 1998 with satisfaction surveys Ball State University’s Early Alert Survey demonstrated success Fusion of BSU’s survey and EBI’s technology 3

4 MAP-Works: How it Helps Student Surveys -Tool provides timely information to students to influence behavioral changes Survey Data - May be combined with UW retention data to determine patterns and program interventions Student Interventions -Tool provides designated faculty and staff with information to discuss concerning behavior with students 4

5 MAP-Works: Data Elements Student Transition Survey – Early Behaviors -Tool provides timely information to students to influence behavioral changes -Learning (expected grades, grades earned in the past, basic study skills, maximization of study skills) -Connections (student activities and residence hall life) -Making Healthy Choices (time management, eating healthy) -Knowing Yourself (academic abilities and self-management) Data Uploads Campus Resource Uploads Institutional Specific Questions 5

6 MAP-Works: Risk Indicator 6

7 7

8 Access to MAP-Works: Groups Colleges Advisors Learning Communities Ethnic Minority Students * Initial groups defined through BANNER Athletics Residence Hall Students SEO 8

9 MAP-Works: Interventions Information will be shared with students regarding the tool Confidentiality statement on the survey will discuss institutional use of results Faculty/Staff utilizing the system participate in training sessions Interventions are coordinated through notes within the system Students take the survey between weeks 5-7 of fall semester Veterans were added in 2011, transfer students will be added in 2012 9

10 For More Information www.map-works.com 12


Download ppt "Map-Works 2011 A First-Year Retention Initiative 1."

Similar presentations


Ads by Google