Download presentation
Presentation is loading. Please wait.
1
Central Plant Solano Nursing Sim Lab Student Union Decision Center Construction Plan Summer 2008 Bell Tower Crawl Space Data Center Upgrade
2
Central Plant Student Union Decision Center Construction Plan Fall 2008
3
Central Plant Student Union Construction Plan Spring 2009 BLDG HVAC Relocate from Univ Hall To Solano Hall North Hall
4
Central Plant Construction Plan Summer 2009 BLDG HVAC Relocate from Bell Tower To Solano Hall North Hall
5
Central Plant Construction Plan Fall 2009 Santa Rosa Village Develop Mall West Hall Art Studios
6
Central Plant Infrastructure Project Phase I
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.