Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 7 July 2003 Sam Burke UCSB HEP Group
2
Slide 2UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Progress Designed Pitch Adaptor Antenna à In Machine Shop Assembly of Cold Box with all Sensors First System Test using full modified CERN Code à Temperature Sensor Test à Humidity Sensor Test
3
Slide 3UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Pitch Adapter Antenna
4
Slide 4UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Progress à
5
Slide 5UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 1st Cold Box System Test
6
Slide 6UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Future Plans Complete T/E Element Cabling à Assembly of Relay Control Board T/E Element Testing à CERN Code à Chiller Water à Room Temp to - 20 deg C Fabricate Flow Control Panel (see photo) à 19” Panel in HEP Shop (Chris) à Lance to start assembly soon
7
Slide 7UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Flow Control Panel
8
Slide 8UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Flow Control Panel
9
Slide 9UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Flow Control Panel Note following components à Digital I/O board à Solid State Relays à Solenoid valves à Flow sensor
10
Slide 10UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Peltier Relay Board