Download presentation
Presentation is loading. Please wait.
1
Tasks for Follow-up workshop A.K.M. Saiful Islam Institute of Water and Flood Management (IWFM) Bangladesh University of Engineer and Technology (BUET) Training workshop on Regional Climate Modeling using PRECIS February 14-18, 2010, Dhaka, Bangladesh Meeting-1: March 20, 2010
2
Outline Discussion on problems during PRECIS installation. Distribution of LBC data of ER40 from December 1979 to 1990 Distribution of Regions (Domains) files Assigning the tasks to the participants for follow-up workshop. PRECIS Bangladesh Group Information can be found in CCSC web site at- http://teacher.buet.ac.bd/diriwfm/climate /precis/ http://teacher.buet.ac.bd/diriwfm/climate
3
Regions proposed for Bangladesh by Met office 1.Bangladesh -1 (50km, 25km Resolution) - Built in domain for India 2.Bangladesh -2 (50km, 25km Resolution) - Large Domain (127x112 for 50km) 3.Bangladesh -3 (50km Resolution)- Medium Domain (85x97 for 50km) 4.Bangladesh -4 (50km Resolution)- Small Domain (75x75 for 50km)
4
Domain files
5
Domain-1 Default India Region File in your PRECIS installation folder /home/precis/region
6
Domain-2 (50km)
7
Domain-3 (50km)
8
Domain-4 (50km)
9
Winter – western disturbances Winter: western disturbances/NE Monsoon Summer: Monsoon depressions PM: Tropical storms PrM: Thunder Considerations for selecting Bangladesh Domain for PRECIS - by Met office
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.