Download presentation
Presentation is loading. Please wait.
1
© 2010 Pearson Addison-Wesley. All rights reserved. Addison Wesley is an imprint of Chapter 4: Selection Structures: if and switch Statements Problem Solving & Program Design in C Sixth Edition By Jeri R. Hanly & Elliot B. Koffman
2
1-2 © 2010 Pearson Addison-Wesley. All rights reserved. 1-2 Figure 4.1 Evaluation Tree and Step-by- Step Evaluation for !flag || (y + z >= x - z)
3
1-3 © 2010 Pearson Addison-Wesley. All rights reserved. 1-3 Figure 4.2 Range of True Values for min <= x && x <= max
4
1-4 © 2010 Pearson Addison-Wesley. All rights reserved. 1-4 Figure 4.3 Range of True Values for z > x || x > y
5
1-5 © 2010 Pearson Addison-Wesley. All rights reserved. 1-5 Figure 4.4 Flowcharts of if Statements with (a) Two Alternatives and (b) One Alternative
6
1-6 © 2010 Pearson Addison-Wesley. All rights reserved. 1-6 Figure 4.5 if Statement to Order x and y
7
1-7 © 2010 Pearson Addison-Wesley. All rights reserved. 1-7 Figure 4.6 Structure Chart for Water Bill Problem
8
1-8 © 2010 Pearson Addison-Wesley. All rights reserved. 1-8 Figure 4.7 Program for Water Bill Problem
9
1-9 © 2010 Pearson Addison-Wesley. All rights reserved. 1-9 Figure 4.7 Program for Water Bill Problem (cont’d)
10
1-10 © 2010 Pearson Addison-Wesley. All rights reserved. 1-10 Figure 4.7 Program for Water Bill Problem (cont’d)
11
1-11 © 2010 Pearson Addison-Wesley. All rights reserved. 1-11 Figure 4.7 Program for Water Bill Problem (cont’d)
12
1-12 © 2010 Pearson Addison-Wesley. All rights reserved. 1-12 Figure 4.8 Sample Run of Water Bill Program
13
1-13 © 2010 Pearson Addison-Wesley. All rights reserved. 1-13 Figure 4.9 Function comp_use_charge Revised
14
1-14 © 2010 Pearson Addison-Wesley. All rights reserved. 1-14 Figure 4.9 Function comp_use_charge Revised (cont’d)
15
1-15 © 2010 Pearson Addison-Wesley. All rights reserved. 1-15 Figure 4.10 Function comp_tax
16
1-16 © 2010 Pearson Addison-Wesley. All rights reserved. 1-16 Figure 4.10 Function comp_tax (cont’d)
17
1-17 © 2010 Pearson Addison-Wesley. All rights reserved. 1-17 Figure 4.11 Flowchart of Road Sign Decision Process
18
1-18 © 2010 Pearson Addison-Wesley. All rights reserved. 1-18 Figure 4.12 Example of a switch Statement with Type char Case Labels
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.