Presentation is loading. Please wait.

Presentation is loading. Please wait.

LIGO-G030557-00-M Status of LIGO Barry Barish PAC Meeting Caltech 3-June-04 Upper limits on known pulsar ellipticities.

Similar presentations


Presentation on theme: "LIGO-G030557-00-M Status of LIGO Barry Barish PAC Meeting Caltech 3-June-04 Upper limits on known pulsar ellipticities."— Presentation transcript:

1 LIGO-G030557-00-M Status of LIGO Barry Barish PAC Meeting Caltech 3-June-04 Upper limits on known pulsar ellipticities

2 LIGO-G030557-00-M 3-June-04PAC Mtg -- Caltech2 Goals and Priorities Interferometer performance »Integrate commissioning and data taking consistent with obtaining one year of integrated data at h = 10 -21 by end of 2006 Physics results from LIGO I »Initial upper limit results by early 2003 »First search results in 2005 »Reach LIGO I goals by 2007 Advanced LIGO »Prepare advanced LIGO proposal this fall »International collaboration and broad LSC participation »Advanced LIGO installation beginning by 2007

3 LIGO-G030557-00-M 3-June-04PAC Mtg -- Caltech3 LIGO Sensitivity Evolution Hanford 4km Interferometer Dec 01 Nov 03

4 LIGO-G030557-00-M 3-June-04PAC Mtg -- Caltech4 Best Performance to Date …. Range ~ 6 Mpc

5 LIGO-G030557-00-M 3-June-04PAC Mtg -- Caltech5 LIGO Commissioning and Science Timeline Now

6 LIGO-G030557-00-M 3-June-04PAC Mtg -- Caltech6 Goals and Priorities Interferometer performance »Integrate commissioning and data taking consistent with obtaining one year of integrated data at h = 10 -21 by end of 2006 Physics results from LIGO I »Initial upper limit results by early 2003 »First search results in 2004 »Reach LIGO I goals by 2007 Advanced LIGO »Prepare advanced LIGO proposal this fall »International collaboration and broad LSC participation »Advanced LIGO installation beginning by 2007

7 LIGO-G030557-00-M 3-June-04PAC Mtg -- Caltech7 Sensitivity during S1 GEO data exchange for S1 RUN LIGO S1 Run ---------- “First Upper Limit Run”  23 Aug–9 Sept 2002  17 days  All interferometers in power recycling configuration LLO 4Km LHO 2Km LHO 4Km

8 LIGO-G030557-00-M 3-June-04PAC Mtg -- Caltech8 S1 “Methodology” Papers Detector Paper “Detector Description and Performance for the First Coincidence Observations between LIGO and GEO” l Periodic Sources “Setting upper limits on the strength of periodic gravitational waves using the first science data from the GEO600 and LIGO detectors” l Inspiral Sources “Analysis of LIGO data for gravitational waves from binary neutron stars” l Stochastic Sources “Analysis of First LIGO Science Data for Stochastic Gravitational Waves” l Burst Sources “First upper limits on gravitational wave bursts from LIGO”

9 LIGO-G030557-00-M 3-June-04PAC Mtg -- Caltech9 LIGO Sensitivity -- L1 May 01 Jan 03 S1 First Science Run 17 days - Sept 02 S2 Second Science Run 59 days - April 03

10 LIGO-G030557-00-M 3-June-04PAC Mtg -- Caltech10 Science Runs S2 ~ 0.9Mpc S1 ~ 100 kpc E8 ~ 5 kpc NN Binary Inspiral Range S3 ~ 3 Mpc Design~ 18 Mpc A Measure of Progress Milky Way AndromedaVirgo Cluster

11 LIGO-G030557-00-M 3-June-04PAC Mtg -- Caltech11 Post S3 at LLO active external seismic HAM BSC External Pre-Isolators

12 LIGO-G030557-00-M 3-June-04PAC Mtg -- Caltech12 Advanced LIGO proposed in early 2003 Active Seismic Multiple Suspensions Sapphire Optics Higher Power Laser

13 LIGO-G030557-00-M 3-June-04PAC Mtg -- Caltech13 AdLIGO Status as a Project Large Projects at NSF are funded through MREF account (projects with total cost of more than ~10% of the annual division budget) A long list of possible MREF projects (23) are under discussion by all the directorates and the list changes with time. A shorter list of reviewed projects (11) are discussed annually with the NSB annually (a more stable list, but not prioritized) The Assistant Directors advise the Directorate (who decides) what and when to bring projects forward to NSB for consideration and approval Next big step is to obtain NSB approval and then inclusion in future MREF budgets to OMB (FY06?) LIGO

14 LIGO-G030557-00-M LIGO Outreach Program $5M for 5 years LSC Collaborating Groups are invited to participate in the LIGO Laboratory Outreach Activities

15 LIGO-G030557-00-M 3-June-04PAC Mtg -- Caltech15 LIGO Outreach Collaboration l LIGO provides the science and facilities l Exploratorium exhibits the science l Southern University brings LIGO science to science education l Louisiana Board of Regents extends our program through public education

16 LIGO-G030557-00-M 3-June-04PAC Mtg -- Caltech16 Site Plan OUTREACH CENTER LVEA OSB Existing unpaved site adjacent to LLO conference facility & temporary exhibit space Erect new building with direct access to auditorium foyer BUS & CAR PARKING staging lot

17 LIGO-G030557-00-M 3-June-04PAC Mtg -- Caltech17 Conclusions l S1 Analysis Complete. Five Papers approved for publication. l S2 Data Run was ~x10 better sensitivity and ~x4 more running time. Data analysis is near complete and we plan to present the results at GR-17 in Dublin in July. LSC Data Analysis Meeting this weekend l S3 Data Run: Three interferometers with extragalactic sensitivity. Analysis not yet underway l LIGO is shutdown to install L1 seismic mitigation l Advanced LIGO was proposed in Jan 03 and was well reviewed. It is now awaiting approval by the NSB. l Short term goals: »Commission Seismic Retrofit »Improve sensitivity and reliability to near design and initiate the extended LIGO I search run.

18 LIGO-G030557-00-M 3-June-04PAC Mtg -- Caltech18 This Meeting Review the Status of the LIGO Data Analysis, including new results Review Status of Commissioning and Seismic Retrofit l Discussion and Advice on Possible LIGO Laboratory Management Structural Changes


Download ppt "LIGO-G030557-00-M Status of LIGO Barry Barish PAC Meeting Caltech 3-June-04 Upper limits on known pulsar ellipticities."

Similar presentations


Ads by Google