Download presentation
Presentation is loading. Please wait.
1
Responsibility on Next Beam Test Jianchun Wang Syracuse University BTeV meeting 06/27/01
2
Jianchun (JC) Wang2 Simulation of Telescope Parallel with BTeV simulation, in same manner. First stage, it works alone. Then plug into BTeV Geant. SU should take all responsibility on this. Input information: Track momentum, trajectory, particle species Detector geometry: position (x,y,z), direction ( ), pixel size Electronics information: noise, threshold spread, ADC steps Output information: It should write out same format as real data, but include generated information We need to know the format of output event, the event should also have tag, we need to discuss with Fermilab people and Charles on possible format The analysis code should be the same for both data, except with extra information on generator level information
3
06/27/01Jianchun (JC) Wang3 Analysis Code We should absorb the old code as much as possible, but some part like Kalman filter change too much to incorporate with old code The new code will include information at generator level. It might be possible that we work all in BTeV Geant environment, which has track fitting and so on in it, other wise we need to write or copy this part It should also have the ability to write and read summary file and perform auto alignment as I introduced into it before SU can put big effort on this, if the simulation part works well, maybe Charles wants to contribute more since he originally wrote the former code
4
06/27/01Jianchun (JC) Wang4 Data Taking We surely will contribute more than last time on taking shift and so on If possible, we also want to involve in DAQ part, on the condition that it is necessary and we can handle other responsibilities of this beam test
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.