September 2006Dirk Wiedner / Installation1 3-D Rackwizard How to keep track of cables to the detector
2
September 2006Dirk Wiedner / Installation2 What we have so far… RACKWIZARD shows the rack data base Crates, boards and cables can be added to a rack Drag & Drop Correct labels for cables generated
3
September 2006Dirk Wiedner / Installation3 Find Your rack
4
September 2006Dirk Wiedner / Installation4 Insert Crate and Boards
5
September 2006Dirk Wiedner / Installation5 Connect cables
6
September 2006Dirk Wiedner / Installation6 From Rack to Detector Cables from Rack to detector? Cables inside detector? Add detector parts to RACKWIZARD 3-D visualization Use detector parts like crates Insert boards Connect cables SQL scripts / Java
7
September 2006Dirk Wiedner / Installation7 OT ECAL 3-D Detector Select component
8
September 2006Dirk Wiedner / Installation8 Crate view Detector component used like crate Cables now connectable
9
September 2006Dirk Wiedner / Installation9 Summary Rackwizard-3D extends data base access to sub-detectors 3-D detector view Drag and drop for cabling detector parts
10
September 2006Dirk Wiedner / Installation10 Next steps Sub-detectors are inserted to data base –ECAL and OT visualized Boards and cables to be added next –RICH, HCAL next –VELO/VETO, ST, PS/SPD, Muon than Information required from sub-detectors: –Sub-detector Geometry (simplified) –Connectors, labeling scheme, cabling