Download presentation
Presentation is loading. Please wait.
1
Detector Systems Update MICO March 10, 2008
2
MICE Detector Systems CKOV u No update TOF0/1 u Tests with laser injection system progressing. u Tests with cosmics on TOF0 going on. Tracker u Work continues on AFEII firmware u Cryo 1, 2 and 4 now operational Calorimeter u The new trigger counters (100 cm long, 10 cm wide, 2.5 cm thick) with single magnetic shielding have been built. u Test and calibration runs of KL started on Saturday collecting cosmic rays data with QDC (same DAQ system used at BTF test beam). u Waiting for drawings of the second Virostek plate and, consequently, of the TOF2 shielding frame, some modifications of the current supporting table have been decided to realize quickly a temporary trolley for KL alone on the beam line (plus, if possible, the SW prototype
3
Beam Monitors u Large Beam Monitor is complete – testing this week s Target ship of LBM by 3/14 s Thanks to Greg and Rolando for working OT this weekend u Fermilab Team arrives at RAL on 3/24 for installation and commissioning
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.