CS 194 Research Checkpoint Paul Salzman Advisor: Professor Glenn Reinman Winter 2007
2
Outline Proposed Checkpoint Goals Current Accomplishments Difficulties Next Steps
3
Proposed Checkpoint Goals Develop a simulator using SESC with MINT 4-8 weeks Create various workloads for the simulated architecture 1-2 weeks
4
Accomplishments Heterogeneous Cores up and running. Network latency modeling on its way. Still in the process of developing a simulator using SESC with MINT
5
Difficulties Lack of up to date simulator documentation. Network communication latency modeler functional but disconnected in simulator.
6
Next Steps Tie the network latency modeler into the simulator. Create various workloads for the simulated architecture 1-2 weeks Analyze performance to determine how different resource allocations can be applied. 8+ weeks