Presentation is loading. Please wait.

Presentation is loading. Please wait.

M2: Team Paradigm :: Milestone 7 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.

Similar presentations


Presentation on theme: "M2: Team Paradigm :: Milestone 7 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping."— Presentation transcript:

1 M2: Team Paradigm :: Milestone 7 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping Zhan

2 M2: Team Paradigm Team Paradigm

3 M2: Team Paradigm Project Status 18-525, Integrated Circuits Design Project Design Proposal (Done) Architecture Proposal (Done) Gate level Design(Done) Component Layout (DRC & LVS): (Done) Component Simulation: (Done) Component Layout (Corrected) Updated Floor plan To be done: Chip Layout Spice Simulation of Entire Chip Still Speed but also Reduction of size Design Goals

4 M2: Team Paradigm Updated components

5 M2: Team Paradigm 16:1 Mux - Schematic

6 M2: Team Paradigm 16:1 Mux - Layout

7 M2: Team Paradigm 16:1 Mux – Rise Delay (387pS)

8 M2: Team Paradigm 16:1 Mux – Rise time (208pS)

9 M2: Team Paradigm 16:1 Mux – Fall delay (402pS)

10 M2: Team Paradigm 16:1 Mux – Fall time (218pS)

11 M2: Team Paradigm 4:1 Mux – Layout (old)

12 M2: Team Paradigm 4:1 Mux – Layout (new)

13 M2: Team Paradigm 64x16 Dual Port SRAM

14 M2: Team Paradigm 64x16 dual port SRAM --- update 1.Get rid of floating word line, changed to pseudo-NMOS 2.Resize decoder transistors and sense amplifiers to ensure low noise margin 3.Relayout decoder to save a little area, reduced from 130x440 to 120x440 4.LVS, Extract and simulated extracted SRAM circuits

15 M2: Team Paradigm 64x16 dual port SRAM --- old decoder layout

16 M2: Team Paradigm 64x16 dual port SRAM --- new decoder layout

17 M2: Team Paradigm 64x16 dual port SRAM --- extracted simulation, read 0 Delay = 860.58 ps

18 M2: Team Paradigm 64x16 dual port SRAM --- extracted simulation, read 1 Delay = 907.14 ps

19 M2: Team Paradigm Shift Register :Dimensions -87u x 13.9u :Metals -M1, M2, M3

20 M2: Team Paradigm ::Mid-Buffer :Dimensions: - 82.9u X 87.4u :Metals: - M1, M2, M3 :Directionality: -Left to Right and Down

21 M2: Team Paradigm Control Logic 85u by 21u

22 M2: Team Paradigm 1D-DCT Floorplan (old) Total Area: 315u x 264u

23 M2: Team Paradigm 1D-DCT – Floorplan (new) 270u by 200u

24 M2: Team Paradigm 2D-DCT Floorplan (old) Total Area: 505u x 484u

25 M2: Team Paradigm 2D-DCT – Floorplan (new) 430u by 400u

26 M2: Team Paradigm ::conclusion & questions


Download ppt "M2: Team Paradigm :: Milestone 7 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping."

Similar presentations


Ads by Google