Presentation is loading. Please wait.

Presentation is loading. Please wait.

John Arthur Photon October 12, 2006 1 Photon Systems Update John Arthur SLAC 1.

Similar presentations


Presentation on theme: "John Arthur Photon October 12, 2006 1 Photon Systems Update John Arthur SLAC 1."— Presentation transcript:

1 John Arthur Photon updatejarthur@slac.stanford.edu October 12, 2006 1 Photon Systems Update John Arthur SLAC 1

2 John Arthur Photon updatejarthur@slac.stanford.edu October 12, 2006 2 Photon Systems Includes LCLS x-ray and laser groups X-ray Transport, Optics and Diagnostics (XTOD) managed by LLNL (Richard Bionta) X-ray Endstation Systems (XES) managed by SLAC (Stefan Moeller) Laser Systems managed by SLAC (Bill White)

3 John Arthur Photon updatejarthur@slac.stanford.edu October 12, 2006 3 X-Ray Systems Status FY2006 was a design and replan year Scope changes were accommodated XTOD designs have been undergoing reviews XES designs will start reviews imminently FY 2007 is a build year Ready for installation starting November 2007 Ready for first light in Spring 2008

4 John Arthur Photon updatejarthur@slac.stanford.edu October 12, 2006 4 Recent Events FAC April 2006 Recommendations Make x-ray mirror design the top priority Include a full suite of non-destructive diagnostics Consider bringing white beam to FEH Define critical path for commissioning + experiments LCLS actions X-ray mirror specs are now in hand, engineering soon Including robust diagnostics for commissioning and operations White beam option preserved, not first choice Commissioning schedule in preparation

5 John Arthur Photon updatejarthur@slac.stanford.edu October 12, 2006 5 XTOD progress Updated work plan, new ETC Designs moving through review stage FEE West Wall Cable Trays Gas and Solid Attenuator Gas Detector X-Ray Slit and Fixed Mask First x-ray optics

6 John Arthur Photon updatejarthur@slac.stanford.edu October 12, 2006 6 XTOD progress Transport design nearly finished Optics design advanced Most devices have passed preliminary design review Mirrors about to have concept review Diagnostics design underway At concept review stage

7 John Arthur Photon updatejarthur@slac.stanford.edu October 12, 2006 7 XES progress Updated work plan, new ETC 2d x-ray detector development program on schedule, with good reviews so far Working closely with LCLS Controls Group and LUSI

8 John Arthur Photon updatejarthur@slac.stanford.edu October 12, 2006 8 Preliminary design for AMO experiment layout (showing future LUSI station as well) NEH Hutch 2 Expt chambers Laser tables

9 John Arthur Photon updatejarthur@slac.stanford.edu October 12, 2006 9 4 XPCS 5 XCI 6 HED Efficient Experiment Layout Beam can be switched without moving experiments

10 John Arthur Photon updatejarthur@slac.stanford.edu October 12, 2006 10 BCR changes in FY2006 XES Delete some detectors and computers (Feb) Add K-measurement (May) Delete streak camera (June) Revise AMO (June) Delete laser amp and K-measurement (Aug) Net: Decrease of ~$1500k, nearly all TEC XTOD Revise plan (Oct) Delete flipper mirrors and side beamlines, revise plan (Jan) Replan, add K-measurement (Aug) Net: Decrease of ~$1800k TEC, increase of ~$900k OPC

11 John Arthur Photon updatejarthur@slac.stanford.edu October 12, 2006 11 Summary X-ray groups in design phase; going well Net scope reduction has been accommodated Project scope and beamline design have crystallized Working hard on critical instrumentation


Download ppt "John Arthur Photon October 12, 2006 1 Photon Systems Update John Arthur SLAC 1."

Similar presentations


Ads by Google