Download presentation
Presentation is loading. Please wait.
1
SIESTA for Virgo locking experience L. Barsotti University of Pisa – INFN Pisa on behalf of the Virgo Locking Group Cascina, March 16th 2004 Simulation Workshop
2
Outlines Commissioning of the first 3–km cavity Recombined mode Full Virgo Other activities in parallel
3
North Cavity Optical Scheme B1p T=8% T=50 ppmT=12% 6 W B5B5 B7B7 PR, WI, WE mirrors misaligned WE WI NENI BS PR
4
Commissioning of the North Cavity Feedback characterization: optical gain open loop transfer function Analysis of the lock algorithm efficiency linearized error signal no linearized error signal Comparison with real data (C1, C2 runs) Real suspensions, real actuators, real photodiodes, computational delays included in the simulation
5
North Cavity Control Scheme B1p T=8% B7B7 NE NI BS PR Hz |Gain| frequency Lock Acquisition Linearized error signal:
6
Optical Gain: Measured Simulated
7
Transfer Function Open Loop simulated measured Gain Phase M G zErrzCorr noise
8
Lock Algorithm Efficiency Lock almost always acquired at the first trial C1 run data : Several lock events collected locking and delocking the cavity linearized error signal
9
Lock Algorithm Efficiency Failed locking attempt v ~ 12.5 m/s 8 m/s: maximum velocity for the lock acquisition success Constraints on the velocity according to the theory: Gain due to the linearization: ~ 10
10
Lock Algorithm Efficiency With velocity lower than 10 m/s lock at the first attempt With velocity higher than 10 m/s lock at the second attempt Lock failed Sweep at 12 m/s : Lock event
11
Lock Algorithm Efficiency Failed locking attempts not linearized error signal C1 data Simulation
12
SIESTA link to real time control SIESTA Control signals Photodiodes signals Algorithms running in the global control
13
SIESTA link to real time control Control signals Photodiodes signals Algorithms running in the global control VIRGO
14
Recombined Optical Scheme B1B1 T=8% B5B5 B7B7 B8B8 B2B2 WE NE NI WI BS PR PR mirror misaligned
15
Recombined mode 2 Steps locking strategy: sensing matrix procedure to find experimentally the algorithm parameters from simple optical systems 3 Steps locking strategy sensitivity curve comparison with real data Linear locking
16
Reconbined 2 Steps Control Scheme B1B1 B5B5 B7B7 B8B8 B2B2 north cavity controlled with B5 west cavity and michelson controlled at the sime time
17
Theorical optical matrix: Optical matrix measured by Siesta: Michelson and West cavity controlled with the symmetric (B2_quad) and the antysimmetric signal (B1p_quad) Sensing matrix
18
Locking simulation – North cavity Locking
19
Locking simulation – Mich & West PowersLengths Triggers Corrections
20
B7_demod B1p_demod B2B2 North arm West arm B5B5 B8_demod switch from B1p to B1 after the lock acquisition Recombined 3Steps Control Scheme
21
Lock acquisition - simulation “Simple” simulation: real suspensions and actuators
22
Lock acquisition - simulation
23
First lock acquisition 27th February Locking event At 3.25 am
24
Sensitivity - simulation Improvement: real photodiodes (electronic noise, shot noise)
25
Sensitivity Simulated Measured
26
Switch to the linear locking state Optical matrix: d2_quad d2_phase d1p_quad MICH CARM DARM Inverse optical matrix:
27
⊗ B1p_quad B2_quad North arm West arm B2_phase Linear Locking Control Scheme
28
Linear lock of the recombined Simulation
29
Full Virgo Optical Scheme B1B1 B5B5 B7B7 B8B8 B2B2 WE NE NI WI BS PR
30
Multi–states approach (LIGO scheme) Dynamical inversion of the optical matrix Lock acquisition of full Virgo
32
Something more… Modal simulation Longitudinal local control optimization Spikes removal
33
Modal simulation High order modes (n + m ≤ 5 ) compromise with the computational time 1 sec @ 20 kHz ⇒ 45 sec Check with other codes in progress 0.113 misalignment of 2 rad in y of the curve mirror
34
Something more… Modal simulation Longitudinal local control optimization Spikes removal
35
Optimization of the z damping loop – I 10 sec zCorr zMirror mm Hz Unity gain @ 0.65 Hz measured Open loop transfer function Damping time sec
36
Optimization of the z damping loop – II simulated Open loop transfer function Critical damping @ 1.45 Hz Hz m VV zCorrzMirror 2 sec
37
Optimization of the z damping loop – III measured after the optimization mm VV ~ 2 sec zCorrzMirror Guadagno open loop Hz Critical damping @ 1.45 Hz
38
Something more… Modal simulation Longitudinal local control optimization Spikes removal
39
Spikes removal
40
Rearrange the algo: Error signal derivative window integrator window
41
Hierarchical control Other activity: Hierarchical control marionetta reference mass mirror z Control from the reference mass Control from the marionetta Transfer function betweeen force on steering filter and z movement of the mirror preliminary results wwwcascina.virgo.infn.it/collmeetings/presentations/Mar2004/Fiori_11Mar04_MarioLockSim.ppt
42
Conclusions Siesta: fundamental tool for locking studies Link to the real time control system Work in parallel with other groups to improve the simulation (suspensions, alignment) Noise analysis
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.