Download presentation
Presentation is loading. Please wait.
1
Target K. Long, 23 August 2009 Sunday 23Aug09 Water and power connections made Test water, check power Will plan soak test
2
Status of build: Target 1: – Complete, 50 k actuations done OK Target 2: – Complete
3
Critical path: Issue: – Modified power supply: Charge/discharge time-constant differs between +ve and –ve capacitor banks S.Griffiths will investigate – Testing continues with power supply brought to RAL form Sheffield Installation planned ‘on schedule’: – Tuesday/Wednesday 25/26Aug09
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.