Udine - April 19th 20041 Data Check for MAGIC Raquel de los Reyes Universidad Complutense de Madrid (U.C.M.)
2
Udine - April 19th 20042 Contents The program Central control data check DAQ data check Conclusions
3
Udine - April 19th 20043 Program Group of scripts and Root macros to check the subsystems and the data taken at the end of each night shift. Two scripts: CCDataChecking & DAQDataChecking Two macros: CCDataCheck.C & DAQDataCheck.C Thanks to F. Goebel and R. Wagner http://www.magic.iac.es/operations/datacheck
4
Udine - April 19th 20044 Central control data check Drive system General camera status Camera HV Camera DC Camera LV Cooling system Trigger system Trigger macro cells Weather station
5
Udine - April 19th 20045 Drive system (CC_2004_02_15.ps) CrabNebula OffMrk421-1 Mrk421 OffCrab4 21:58 & 03:22 :Cosy crashed no reported Thanks to T. Bretz and D. Dorner
6
Udine - April 19th 20046 General camera status (CC_2004_02_15.ps) 21:35: Guagua crashed Change source: OffCrab4 – Mrk421Move to CrabNebula End shift
7
Udine - April 19th 20047 Camera High Voltages (HV) (CC_2004_02_15.ps) Failure of master voltage regulator boards and the six adc boards monitoring HV y DC in sectors 3-5 no reported 21:35: Guagua crashed Thanks to J.Flix
8
Udine - April 19th 20048 Camera Direct Currents (DC) (CC_2004_02_15.ps) 21:35: Guagua crashed no reported
9
Udine - April 19th 20049 Camera Low Voltages (LV) (CC_2004_02_15.ps) 21:35: Guagua crashed no reported
10
Udine - April 19th 200410 Cooling system (CC_2004_02_15.ps) Thanks to E. Domingo and R. Firpo
11
Udine - April 19th 200411 Trigger system (CC_2004_02_15.ps) 21:26: ZetaTauri Pedestal runs(PED)/calibration runs(L1_5NN:L2_DEFAULT) Thanks to R. Paoletti and A. Stamerra Calibration runs Firing macrocells 2 and 7 Low threshold pixels 3, 9 and 21
12
Udine - April 19th 200412 Trigger macro cells (CC_2004_02_15.ps) UMa51 in pixels 3, 9 and 21: Macrocells 2 and 7 Fire not reported: Pixels(HW) 88, 89, 123, 124, 125, 165, 166
13
Udine - April 19th 200413 Weather station (CC_2004_02_15.ps) Thanks to A. Torres
14
Udine - April 19th 200414 DAQ data check Pedestal Calibration Conversion factor Defect pixels Fitted charges Reduced sigma per charge Absolute arrival times Timing
15
Udine - April 19th 200415 Pedestals (IFAE sample C (on): 15/02 - 17031-17123)
16
Udine - April 19th 200416 Calibration (I): Conversion factor (IFAE sample C (on): 15/02 - 17031-17123) Thanks to J. Cortina and M. Gaug
17
Udine - April 19th 200417 Calibration (II): Defect pixels (IFAE sample C (on): 15/02 - 17031-17123)
18
Udine - April 19th 200418 Calibration (III): Fitted charges (IFAE sample C (on): 15/02 - 17031-17123)
19
Udine - April 19th 200419 Calibration (IV): Reduced sigma per charge (IFAE sample C (on): 15/02 - 17031-17123)
20
Udine - April 19th 200420 Calibration (V): Absolute arrival times (IFAE sample C (on): 15/02 - 17031-17123)
21
Udine - April 19th 200421 Timing ( CrabOn: 17/02 - 18249 – 18482 ) Thanks to M. López
22
Udine - April 19th 200422 Conclusions The CC check plots will allow us to take a look to night conditions and hardware problems. The DAQ check plots will make a preliminar analysis of night data. In the future these scripts could interact with the DataBase to collect the hardware problems. STATUS: CC data check running DAQ data check in tests.