Download presentation
Presentation is loading. Please wait.
1
12.9.03TRD Status meeting Alice week HdClemens Adler TRD Chamber Status News: New leak rate measurements Production is imminent Some material arrived Soldering machine arrived at Frankfurt X-Ray test stand is taking shape Bukarest joins Production Goal: get ready by end of this year
2
12.9.03TRD Status meeting Alice week HdClemens Adler Leak rate New Gas system from Rainer: –~0 intrinsic leak rate Leak Rate < 0.1 mbar* l/h (~precision limit) with greased gas connectors See how it develops with realistic configuration: 5 chambers in a row, some angular deviation...
3
12.9.03TRD Status meeting Alice week HdClemens Adler Soldering Soldering machine arrived at IKF (mid August) Where to put the solder still unresolved Start tests as soon as possible (Monday)
4
12.9.03TRD Status meeting Alice week HdClemens Adler X-ray Test Stand Requirements defined Mechanical impementation decided: needs engineering work: September Material ordering (Hd): September Delivery: Oktober Assembly/ TÜV: Okt./Nov.
5
12.9.03TRD Status meeting Alice week HdClemens Adler X-ray test stand cont. Increase of HV ensures longer tube life Possible with planned Power supply
6
12.9.03TRD Status meeting Alice week HdClemens Adler Winding machine New winding frame is sturdy enough, even in weight reduced version Meteor displays a loss of tension over first windings. Winding machine modification: scheduled beginning of Sept. need to check
7
12.9.03TRD Status meeting Alice week HdClemens Adler Crane New crane for the clean room is ordered: arrives 2nd Oct. Week Needed for moving of winding frames to tables
8
12.9.03TRD Status meeting Alice week HdClemens Adler Material Status Arrived: Wacosit profile (frame) arrived: Side profiles warped, but OK after glueing to Al profiles Voltage divider PCBs arrived Signal cables arrived In Approach: Padplanes (slight delay, due to manufacturing confusion): finished end of next week Fischer panel: ~4 weeks from now To order: Vacuum tables Glueing tables Connectors (ROB): Minimum 15k pc. = 3930 € 60% TRD: 39k pc. = 10218 € Need add. Offers? Delay...
9
12.9.03TRD Status meeting Alice week HdClemens Adler Padplane Production steps were discussed with Optiprint to optimize mechanical precision where we need it. Result: Question from Optiprint 2 weeks ago: „do we need this precision?? Will bring up the price considerably.“ = some unfortunate mixup... 2 week delay
10
12.9.03TRD Status meeting Alice week HdClemens Adler Near Term Schedule
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.