1
UMass Lowell Computer Science 91.503 Analysis of Algorithms Prof. Karen Daniels Fall, 2001 Lecture 2 (Part 2) Tuesday, 9/11/01 Amortized Analysis
2
Overview ä Amortize: “To pay off a debt, usually by periodic payments” [Websters] ä Amortized Analysis: ä “creative accounting” for operations ä can show average cost of an operation is small (when averaged over sequence of operations) even though a single operation in the sequence is expensive ä result must hold for any sequence of these operations ä no probability is involved (unlike average-case analysis) ä guarantee holds in worst-case ä analysis method only; no effect on code operation
3
Overview (continued) ä 3 ways to determine amortized cost of an operation that is part of a sequence of operations: ä Aggregate Method ä find upper bound T(n) on total cost of sequence of n operations ä amortized cost = average cost per operation = T(n)/n ä same for all the operations in the sequence ä Accounting Method ä amortized cost can differ across operations ä overcharge some operations early in sequence ä store overcharge as “prepaid credit” on specific data structure objects ä Potential Method ä amortized cost can differ across operations (as in accounting method) ä overcharge some operations early in sequence (as in accounting method) ä store overcharge as “potential energy” of data structure as a whole ä (unlike accounting method)
4
Aggregate Method: Stack Operations ä Aggregate Method ä find upper bound T(n) on total cost of sequence of n operations ä amortized cost = average cost per operation = T(n)/n ä same for all the operations in the sequence ä Traditional Stack Operations ä PUSH(S,x) pushes object x onto stack S ä POP(S) pops top of stack S, returns popped object ä O(1) time: consider cost as 1 for our discussion ä Total actual cost of sequence of n PUSH/POP operations = n
5
Aggregate Method: Stack Operations (continued) ä New Stack Operation ä MULTIPOP(S,k) pops top k elements off stack S ä pops entire stack if it has < k items ä MULTIPOP actual cost for stack containing s items: ä Use cost =1 for each POP ä Cost = min(s,k) ä Worst-case cost = O(n) MULTIPOP(S,k) 1 while not STACK-EMPTY(S) and k = 0 2do POP(S) 3 k k - 1
6
Aggregate Method: Stack Operations (continued) ä Sequence of PUSH, POP, MULTIPOP ops ä initially empty stack (unlike HW#1, problem (2)) ä MULTIPOP worst-case O(n) O(n 2 ) for sequence ä Aggregate method yields tighter upper bound ä Sequence of n operations has O(n) worst-case cost ä Each item can be popped at most once for each push ä # POP calls (including ones in MULTIPOP) <= #push calls ä <= n ä Average cost of an operation = O(n)/n = O(1) ä = amortized cost of each operation ä holds for PUSH, POP and MULTIPOP
7
Accounting Method ä Accounting Method ä amortized cost can differ across operations ä overcharge some operations early in sequence ä store overcharge as “prepaid credit” on specific data structure objects ä Let c i be actual cost of ith operation ä Total amortized cost of sequence of operations must be upper bound on total actual cost of sequence ä Total credit in data structure = ä must be nonnegative for all n
8
Accounting Method: Stack Operations ä Paying for a sequence using amortized cost: ä start with empty stack ä PUSH of an item always precedes POP, MULTIPOP ä pay for PUSH & store 1 unit of credit ä credit for each item pays for actual POP, MULTIPOP cost of that item ä credit never “goes negative” ä total amortized cost of sequence of n ops is O(n) ä PUSH12 ä POP10 ä MULTIPOPmin(k,s)0 Operation Actual Cost Assigned Amortized Cost
9
Potential Method ä Potential Method ä amortized cost can differ across operations (as in accounting method) ä overcharge some operations early in sequence (as in accounting method) ä store overcharge as “potential energy” of data structure as a whole ä (unlike accounting method) ä Let c i be actual cost of ith operation ä Let D i be data structure after applying ith operation Let (D i ) be potential associated with D i ä Amortized cost of ith operation: ä Total amortized cost of n operations: ä Must have:to “pay in advance” terms telescope
10
Potential Method: Stack Operations ä Potential function value = number of items in stack ä guarantees nonnegative potential after ith operation ä Amortized operation costs (assuming stack has s items) ä PUSH: ä potential difference= ä amortized cost = ä MULTIPOP(S,k) pops k’=min(k,s) items off stack ä potential difference= ä amortized cost = ä POP amortized cost also = 0 ä Amortized cost O(1) total amortized cost of sequence of n operations = O(n)
11
Dynamic Tables: Overview ä Dynamic Table T: ä array of slots ä Ignore implementation choices: stack, heap, hash table... ä if too full, increase size (2x) & copy entries to T’ ä if too empty, decrease size (1/4) & copy entries to T’ ä Analyze dynamic table insert/delete ä Actual expansion/contraction cost is large ä Show amortized cost of insert/delete = O(1) Load factor (T) = num[T]/size[T] empty table: (T) = 1 full table: (T) = 1 right after expansion: (T’) = 1/2 right after contraction: (T’) = 1/4
12
Dynamic Tables: Table (Expansion Only) ä Load factor bounds: ä Sequence of n inserts on initially empty table ä Worst-case cost of insert is in O(n) ä Worst-case cost of sequence of n inserts is in O(n 2 ) LOOSE “elementary” insertion
13
Dynamic Tables: Table Expansion (cont) ä Aggregate Method: ä c i = i if i-1 is exact power of 2 ä 1 otherwise ä total cost of n inserts = ä ä Accounting Method: ä intuition for 3 ä each item pays for 3 elementary insertions ä inserting itself into current table ä expansion: moving itself ä expansion: moving another item that has already been moved Amortized Analysis
14
Dynamic Tables: Table Expansion (cont) ä PotentialMethod : Value of potential function ä 0 right after expansion ä builds to table size by time table is full ä always nonnegative, so sum of amortized costs of n inserts is upper bound on sum of actual costs Amortized Analysis ä Amortized cost of ith insert i = potential after ith operation ä Case 1: insert does not cause expansion ä Case 2: insert causes expansion
15
Dynamic Tables: Table Expansion & Contraction ä Load factor bounds: ä Delete pseudocode analogous to insert ä PotentialMethod : Value of potential function ä = 0 for empty table ä 0 right after expansion or contraction builds as (T) increases to 1 or decreases to ¼ ä always nonnegative, so sum of amortized costs of n inserts is upper bound on sum of actual costs = 0 when (T)=1/2 = num[T] when (T)=1 = num[T] when (T)=1/4 Amortized Analysis
16
Dynamic Tables: Table Expansion & Contraction Amortized Analysis ä PotentialMethod
17
Dynamic Tables: Table Expansion & Contraction Amortized Analysis ä Analyze cost of sequence of n inserts and/or deletes ä Amortized cost of ith operation ä Case 1: insert Case 1a: i-1 >= ½. By previous insert analysis: Case 1b: i-1 < ½ and i < ½ Case 1c: i-1 = ½ ä PotentialMethod holds whether or not table expands no expansion
18
Dynamic Tables: Table Expansion & Contraction Amortized Analysis ä Amortized cost of ith operation (continued) ä PotentialMethod ä Case 2: delete Case 2a: i-1 >= ½. (Homework#1, Part 2, Problem(3)) Case 2b: i-1 < ½ and i < ½ Case 2c: i-1 = ½ no contraction contraction Conclusion: amortized cost of each operation is bounded above by a constant, so time for sequence of n operations is O(n).