Christelle Roy - Subatech 1 EMCal – France StatusCERN-020707 Since the Scientific Council
2
design EMCal design participation Mechanics : completed Mechanical architecture of StripModules and SuperModules : completed completed SuperModules Crates : completed ( pict.) in progress StrongBacks : in progress completed Interfaces SuperModules – CalFrame (rails + crates) : completed completed Insertion Tooling : completed completed StripModules handling and tooling : completed completed Electronics/mechanics interfaces : completed Electronics : in progress T-cards + IPCB + GTL bus : in progress Request from Electronics/Daq pool of Subatech
3
SuperModule Crate As designed As machined
4
realization EMCal realization participation Mechanics : completed SuperModules – CalFrame interfaces (rails and crates) : completed in progress StrongBacks manufacturer consulting : in progress order ready to be sent Insertion tooling : order ready to be sent completed Installation of the rails on the CalFrame : completed …last week Load test completed Writing of EMCal 3D-Model : completed + constant upgrade …coming soon… Tests at CERN in October : 4/5 persons available Module assembly (288) StripModules assembly (24)
5
Calframe : Preparation of load test Load test finished week 22, deflections conform to FEA calculations
7
CalFrame Installation of cables trays in SXL2 (on the way)
8
LPSC activities 1/ Supermodule assembly (see J.F. Muraz's talk) - Hall removal - Assembly tools 2/ EMCal Global trigger (see O. Bourrion's talk) - STU design - Test TRU/STU link 3/ Simulation for cosmics calibration (see C. Furget's talk)