Presentation is loading. Please wait.

Presentation is loading. Please wait.

6th Aquarius/SAC-D Science Meeting 19-21 July 2010 Seattle, Washington, USA Radiometer Calibration Working Group Meeting.

Similar presentations


Presentation on theme: "6th Aquarius/SAC-D Science Meeting 19-21 July 2010 Seattle, Washington, USA Radiometer Calibration Working Group Meeting."— Presentation transcript:

1 6th Aquarius/SAC-D Science Meeting 19-21 July 2010 Seattle, Washington, USA Radiometer Calibration Working Group Meeting

2 6th Aquarius/SAC-D Science Meeting Seattle. MWR Calibratio – Jones-Gallo 2 of xx July 19-21, 2010 Working Group Charter Does radiometric calibration working groups (WG) pertain to both AQ and MWR? –Working group recommends separating MWR and AQ calib into separate subgroups –Also combining MWR Algo and Calib WG’s

3 6th Aquarius/SAC-D Science Meeting Seattle. MWR Calibratio – Jones-Gallo 3 of xx July 19-21, 2010 Strawman Plan for MWR Calib Activities

4 6th Aquarius/SAC-D Science Meeting Seattle. MWR Calibratio – Jones-Gallo 4 of xx July 19-21, 2010 Pre-launch Calibration Activities Working group to provide peer review for MWR pre-launch calib activity milestones: 1.Level-1 ATBD review: Nov 2010 2.Calibration test data analysis review: Dec 2010 3.Engring model radiometric test plan review: Jan 2011 4.MWR IOC test plan review: Feb 2011 IOC test plan Cold Sky Calib test plan Inter-sat calib test plan 5.Engr model test data analysis review: Mar 2011

5 6th Aquarius/SAC-D Science Meeting Seattle. MWR Calibratio – Jones-Gallo 5 of xx July 19-21, 2010 In-Orbit & Checkout: L + 45 days Working group will provide consulting and peer review to MWR project engr & AQ Science Team MWR project engr to provide to WG: 1.Daily status: web page, email & telecons 2.Informal IOC data analysis review Entry into routine science operations 3.Website with MWR documentation instr pars & test data 4.Tiger team support for anomaly resolution (as required)

6 6th Aquarius/SAC-D Science Meeting Seattle. MWR Calibratio – Jones-Gallo 6 of xx July 19-21, 2010 IOC + 6 mos Working group will p rovide peer review and consulting to MWR proj engr & AQ Science Team MWR proj engr will provide long-term means and trends for key instr parameters WG will participate in inter-sat radiometric calib Milestones: 1.IOC + 30 days initial calib assessment workshop 2.IOC + 5 mos prelim calib workshop WG assessment report to science team IOC + 6 mos


Download ppt "6th Aquarius/SAC-D Science Meeting 19-21 July 2010 Seattle, Washington, USA Radiometer Calibration Working Group Meeting."

Similar presentations


Ads by Google