Download presentation
Presentation is loading. Please wait.
1
9 GeV Au+Au Collisions Run on March 11 th, 2008 Out of ~200k Events –11000 had Vertices –6700 had Vertices within 2 cm of the beamline –4150 appeared to be beam-pipe events Run details can be found at: http://nuclear.ucdavis.edu/~ddas/9GeV_runs.html Combinations of bbc,vpd,ctb triggers used Rosi Reed rjreed@ucdavis.edu
2
9 GeV Au+Au Collisions
3
Be beam pipe extends from -75 cm to 75 cm
4
Beam-Pipe Collisions and Low Energy Considerations Why did we trigger on “empty” events? Why did we trigger on beam-pipe events Are the events labeled as beam-pipe events actually collisions between Au and the beam pipe? –We looked at the physics in these events to determine whether this was the case
5
Au-Al HBT Analysis (root S NN = 3.2) Event quality cuts: –|Vz| > 75 cm –Vr > 2 cm –Vz*TotalEventPz < 0 Track Quality cuts: –Assumed all negatively charged tracks were pions –nHits/nPossHits > 0.5 for either TPC or FTPC
6
Au-Al HBT Analysis – dE/dx
7
Au-Al HBT Analysis Fit does not use lowest 3 points due to track merging
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.