Download presentation
Presentation is loading. Please wait.
1
P.N. Burrows BDS/MDI, LCWS08 Chicago, 17/11/081 Beam-based feedback for LC ILC luminosity goal 10**34 / cm**2 / s 3000 or 6000 bunches, spacing 150 - 300ns DIGITAL FB approach CLIC luminosity goal 10**35 / cm**2 / s c. 100 bunches, spacing c. < 1ns ANALOGUE FB approach
2
P.N. Burrows BDS/MDI, LCWS08 Chicago, 17/11/082 e- e+ IP beam-based feedback for LC
3
P.N. Burrows BDS/MDI, LCWS08 Chicago, 17/11/083 KickerBPM 1 Digital feedback Analogue BPM processor Drive amplifier BPM 2 BPM 3 e- FONT4 ILC prototype at KEK/ATF 3 bunches, 140-154ns spacing 1.3 GeV
4
P.N. Burrows BDS/MDI, LCWS08 Chicago, 17/11/084 KickerBPM 1 Digital feedback Analogue BPM processor Drive amplifier BPM 2 BPM 3 e- FONT4 ILC prototype at KEK/ATF
5
P.N. Burrows BDS/MDI, LCWS08 Chicago, 17/11/085 Example (1) of May 2008 Results low gain medium gain high gain
6
P.N. Burrows BDS/MDI, LCWS08 Chicago, 17/11/086 Example (3) of May 2008 Results
7
Slack = 22 ns Latency = 154 - slack = 132 ns + 8ns (1/Q) Bunch 1 Kicker pulse Bunch 2 154ns LatencySlack Latency measurement
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.