Download presentation
Presentation is loading. Please wait.
1
1 Federal Aviation Administration Airports GIS | Airport Planning in the NextGen World March 2, 2011https://airports-gis.faa.gov/ A Change in Direction Airports GIS | Update and Transition Policy Presented to | 34 th Annual Airports Conference – Hershey, PA Gil Neumann | FAA Airports - National Planning & Environmental Division Date | Wednesday: March 2, 2011
2
2 Federal Aviation Administration Airports GIS | Airport Planning in the NextGen World March 2, 2011https://airports-gis.faa.gov/ Why Did FAA Create Airports GIS? Federal mandates from the President and OMB ‣ Executive Order 12906 (April 11, 1994) ‣ OMB Circular A-16 (issued 2002; revised 2010) Improve Efficiencies ‣ Airports, FAA, consultants ‣ Single, authoritative, accessible data source Reduce Costs to all Stakeholders Improve Safety ‣ Increased need for real-time data accuracy Support Next Generation of Air Transportation (NextGen) ‣ A repository of airport information (not just survey data) A true paradigm shift in the way we do business… in the right direction: it’s all about the data!
3
3 Federal Aviation Administration Airports GIS | Airport Planning in the NextGen World March 2, 2011https://airports-gis.faa.gov/ Airports GIS | Multiple Stakeholder Perspective FAA | Air Traffic Organization (ATO) ‣ ATO owns and operates the National Airspace System (NAS) ‣ ATO needs accurate, safety-critical (runway ends, NAVAIDS, obstacles) data from airport operational environments ‣ LPV/WAAS efforts well underway (limited interest in non-operational airports data) ATO’s Office of Aeronautical Information Management (AIM) ‣ Tasked with building FAA’s data-sharing environment and infrastructure ‣ Initially developed Airports GIS and eALP ‣ Air Traffic -centric FAA | Office of Airports (ARP) ‣ FAA’s stewards of airports data ‣ ARP manages programming of funds for the Airport Improvement Program (AIP) and Passenger Facility Charges (PFCs) ‣ AIP funds must benefit airports (limited off-airport data collection boundaries) ‣ Currently develop Airports GIS (programming, survey/GIS standards, and policy) and the eALP module Airports (aka, Airport Sponsors) ‣ Communities own and operate airports ‣ Must meet FAA grant requirements ‣ If you’ve seen one airport… The intriguing challenge of Airports GIS: complexity is added to system development, system ownership, and funding of data collection/maintenance because airport data- sets provide benefits that support differing operational missions within the FAA LOB’s (primarily ATO and ARP) as well as data needs of thousands of airports sponsors! Airports GIS
4
4 Federal Aviation Administration Airports GIS | Airport Planning in the NextGen World March 2, 2011https://airports-gis.faa.gov/ Airports GIS other modules other modules Planning Module Planning Module Airports GIS Airports GIS O U T P U T Survey Data Collection Airports GIS at a High Level NFDC | eNASR data Remote Sensing Ground Surveys $ Natl Flt Procedures data iOE/AAA data electronic ALP Module eNOTAMs Module * NAVAIDS records/data ** Airport Design Module ** 139 Inspections Module ** Misc Financial Modules ** Compatible Land Use Module ** Misc Engineering Modules ** Misc Environmental Modules ** Aerial Photos Airport Planning 5010/NASR Data * Airport Ops | NOTAMS * Data | Other Agencies ** New Tech | LiDAR/GPS ** Data Transformation Reduced Redundancy Reduced Costs * In Development | ** Planned I N P U T Data Standards Collection Input AC150/ 5300-16,- 17,-18
5
5 Federal Aviation Administration Airports GIS | Airport Planning in the NextGen World March 2, 2011https://airports-gis.faa.gov/ ARP’s View of Airports GIS Benefits and Challenges Airports GIS will help airports by providing standardized data to support airport construction, land-use planning, environmental compliance, categorical exclusions, recording of NAVAID records, 3-D visualization, and integration into other GIS efforts (airport department-wide; local, State, and federal govt-wide) How valuable is your data? ‣ Think about how all airports data constituents currently reference and use geospatial data/maps related to: Grant review and approval Project eligibility requirements Master Plans/ALPs Obstruction Evaluation (OE) Database/Airspace determinations Runway Safety Area determinations Environmental/NEPA Design review Conformity to plans and specifications (as-builts) Safety and construction phasing Compliance/grant obligations Compatible Land Use Land acquisition FAA’s funding challenge: AIP $ can only benefit airports ‣ How far off the airport property should we collect data? ‣ Will ATO allocate F&E funds for obstacles well beyond airport boundaries? ‣ Who pays for maintaining the data? FAA? Airport? Both?
6
6 Federal Aviation Administration Airports GIS | Airport Planning in the NextGen World March 2, 2011https://airports-gis.faa.gov/ NextGen | Can you see the connection to Airports GIS data? Airports GIS I N P U T OUTPUTOUTPUT
7
7 Federal Aviation Administration Airports GIS | Airport Planning in the NextGen World March 2, 2011https://airports-gis.faa.gov/ Airports GIS | End State Other Modules Planning Module Airports GIS FAA LOBs Agencies Industry Airports APPLYPUBLISHUSECOLLECTSTORECHECK SYSTEMDEPLOYMENT Strategic Implementation Plan MANAGE DATA COLLECTION
8
8 Federal Aviation Administration Airports GIS | Airport Planning in the NextGen World March 2, 2011https://airports-gis.faa.gov/ Airports GIS | Reality/Today Planning Module Airports GIS FAA LOBs Airports APPLYPUBLISHUSECOLLECTSTORECHECK Development/Deployment Perspective: ATMs; PCs; FAX; Internet; e-mail; mobile phones; Google Earth
9
9 Federal Aviation Administration Airports GIS | Airport Planning in the NextGen World March 2, 2011https://airports-gis.faa.gov/ Airports GIS | FY09-10 Accomplishments Emphasis on Survey Standards (Advisory Circulars) and Airports GIS website ‣ 800+ projects in the system (includes LPV/WAAS) Airports GIS Programming (software, website, modules) ‣ Completed electronic ALP proof-of-concept (Sept 2009) ‣ Transitioned from AIM to ARP (Fall 2010) ‣ Deployed -18B schema templates (DWG, DGN, and SHP) Outreach (on-going) and Training ‣ Deployed web-based training (IDLE), FAQs, and Airports GIS Help Desk ‣ ACC, ACI, AAAE, FAA conferences and workshops ‣ Initiated: external training (ACC); internal training (6 Regions by end of CY10) Initiated robust data collection/input efforts ‣ Phase I – 7 Airports (SW and SO Regions); Phase II – 30 Airports (All Regions) ‣ Increasing emphasis on Airports GIS deliverable for all projects ‣ AIP Grant/PFC requirement to incorporate on virtually all projects ‣ Obstruction surveys, construction projects, noise contours, land acquisition ‣ “Tiger Team” deployed to reduce data verification delays Issued Working Draft Guidance (see National Planning Website) 06/24/10 ‣ Draft Strategic Plan created and in review (includes preliminary BCA results) ‣ Draft Transition Policy in review (target for implementation in Jan 11)
10
10 Federal Aviation Administration Airports GIS | Airport Planning in the NextGen World March 2, 2011https://airports-gis.faa.gov/ Airports GIS | FY2011 Priorities Implement Transition Policy* in January and finalize the Strategic Plan Business Case (and begin tie-in with other LOBs, starting with AIM) Data Collection ‣ Complete Phase I pilot program; marked progress on Phase II ‣ Fund additional robust data collection projects at high priority locations Address Growing Pains >>> see next slide ‣ Streamline data verification process (review: plans; control; imagery; data) ‣ Improve website software and project flow (project/partial vs. airport-centric) ‣ Complete deployable eALP module precursors (programming; beta-testing) ‣ Incorporate lessons learned from pilot projects into Advisory Circulars (for updating in FY2012) and programming Outreach and Training (on-going) ‣ Integrated Distance Learning Environment (IDLE) ‣ Continue additional internal/external workshops and outreach efforts ‣ Explanation of ROIs to airport community (from FAA field personnel) ‣ Begin planning for resident training course at FAA Academy * Includes the updated Airports GIS Implementation Guidance (working draft)
11
11 Federal Aviation Administration Airports GIS | Airport Planning in the NextGen World March 2, 2011https://airports-gis.faa.gov/ Airports GIS | Addressing Immediate Challenges APPLYPUBLISHUSECOLLECTSTORECHECK Airports GIS FAA LOBs Airports Enhanced data verification process Improved Web Portal Cost Drivers; Timing eALP beta Transition Policy (for all Airport categories)
12
12 Federal Aviation Administration Airports GIS | Airport Planning in the NextGen World March 2, 2011https://airports-gis.faa.gov/ Airports GIS Transition Policy | Premise Airports GIS ACs were applied too broadly too quickly Estimated 4,000 projects per year (staff is already very busy) One size of requirement does not fit all project types Industry and FAA have a steep learning curve Airports GIS system and processes not ready to handle demand ACs have kinks that need to be worked out Transitioning is the key to realizing program (and NextGen) benefits Program requirements need to be transitioned in practically Phased in to airports by size and relevance to NAS Enforce compliance as appropriate by project Improve awareness, education and support
13
13 Federal Aviation Administration Airports GIS | Airport Planning in the NextGen World March 2, 2011https://airports-gis.faa.gov/ Transition Policy* | Immediate Steps During the transition period, if a survey is required for a project involving safety- critical data, ACs 150/5300-16, -17, and -18 must be used ‣ Any change to safety critical data: new/lengthened runways, procedure design, obstruction analysis ‣ Master Plan updates (which requires an eALP) ‣ Obstruction surveys to develop new or change existing instrument approach procedures For other projects not involving safety-critical data, airports must incorporate Airports GIS requirements on the following schedule: ‣ Large/Medium Hubs: Now (FY 2011)* ‣ Small/Non Hubs: 1 year (FY 2012) ‣ Top Non Primary: 2 years(FY 2013) ‣ Middle Tier GA: 3 Years(FY 2014) ‣ Lower Tier GA: 4 Years(FY 2015) If a survey is not required, project deliverable data must be submitted in paper format, at a minimum, as acceptable to the FAA (in other words: the way we operate for these projects today) Airports are encouraged to initiate their transition to Airports GIS in advance of the timelines set forth above, as appropriate * issued (with and within updated Airports GIS Implementation Guidance) on January 14, 2011
14
14 Federal Aviation Administration Airports GIS | Airport Planning in the NextGen World March 2, 2011https://airports-gis.faa.gov/ Looking Forward | eALP Transition 2011-20122015 + ‣ Airports GIS data collection and submittal ‣ Sponsor/FAA access to data through Airports GIS ‣ Legacy ALP (paper or PDF) ‣ Legacy ALP coordination and approval process ‣ Airports GIS data collection and submittal ‣ Sponsor/FAA access to data through Airports GIS ‣ Electronic Signatures (submittal and approval) ‣ eALP (geo-referenced PDF) with legacy ALP review and approval process ‣ Airports GIS data collection and submittal ‣ Sponsor/FAA access to data through Airports GIS ‣ Electronic eALP submittal ‣ Electronic eALP review and approval through Airports GIS ‣ Geo-referenced PDF (for use outside Airports GIS) Today End State Near Term 2012-2015 Limited e-CapabilityOptimized EfficiencyIncreasing Efficiency
15
15 Federal Aviation Administration Airports GIS | Airport Planning in the NextGen World March 2, 2011https://airports-gis.faa.gov/ Lessons Learned / Using Airports GIS | DFW Airport DFW: LIVE Parking StatusDFW: Flight Track Analysis Airports GIS Pilot Program: Dallas / Fort Worth International Airport (DFW)
16
16 Federal Aviation Administration Airports GIS | Airport Planning in the NextGen World March 2, 2011https://airports-gis.faa.gov/ Lessons Learned / Success Story | Harlingen, TX Airports GIS Pilot Program Success Story: Valley International Airport Typical Airport Deputy Director Project Cost Estimates vs. Actual ‣ Initial FAA Estimates: $50K-$100K per runway end Much less expensive after first project ‣ HRL Budget was $630K (6 runway ends) 30% for non-obstruction data collection 23% for existing data conversion 20% to assemble and test electronic ALP 18% for obstruction survey and airport airspace analysis 09% for travel, production, miscellaneous costs ‣ Actual project costs came in at approximately 65% of estimate Immediate use / benefit (Boeing 787) Additional tools request to consultant (SAAMS)
17
17 Federal Aviation Administration Airports GIS | Airport Planning in the NextGen World March 2, 2011https://airports-gis.faa.gov/ Thank You: Questions Welcome! Upcoming Workshop Airport Consultants Council Airports GIS Workshop April 3-4, 2011 | Kansas City http://www.acconline.org/
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.