System for Engine Location of the WebTrain Adam Weintrop and Paul Wimmer Advisors Dr. Irwin and Dr. Schertz
2
2
3
3 Engine Location Where is the train? Local information to control collisions, decoupling…
4
4 Outline Summary Schedule Functional Description Block Diagram Goals for end of project
5
5 Project Summary Had to recreate train command control system Using current sensing – train location can be determined quickly Microprocessor can control train functions using location information
6
6 Train Control System 3 Level Menu Train Choice Speed Choice Using 10 different speeds to test full range Direction Choice Forwards / Backwards Sends command then “long zeroes”
7
7 Outline Summary Schedule Functional Description Block Diagram Goals for end of project
8
8 Schedule
9
9
10
10 Outline Summary Schedule Functional Description Block Diagram Goals for end of project
11
11 Overall System
12
12 The “2-bit” Method Three train states are significant in this project Software can determine average speed 0 0 - Train is off that section 0 1 - Train is on stopped at the section 1 1 - Train is running on that section
13
13 Outline Summary Schedule Functional Description Block Diagram Goals for end of project
14
14 Block Diagram
15
15 Schematic ~0.5 V
16
16 Outputs of Hardware OFF TRACK RUN IDLE High is >4.35V Low is <40 mV
17
17 Multiplexing 3 - 16 to 4 multiplexer With different chip enable pins on each multiplexer Select lines are the same for all chips Can fill a nibble of track location data(2 sections or individually selected) All outputs are OR’d together to combine to have 4 total outputs at one time This can free up several I/O lines to the microprocessor
18
18 Software Using C code on 80535 Want to take information of train status and location and process Output where train is, status, and implement warnings of collision First step to more advanced software
19
19 Flow Chart
20
20 Outline Summary Schedule Functional Description Block Diagram Goals for end of project
21
21 Plan for Rest of Semester LED board to show train location and status We will have completed the software in 1 week and the rest of the semester will be devoted to testing
22
22 Conclusion With hardware built and software designed, engine location system is near completion Questions?
23
23 Questions? – We have answers A/D method? Need precise A/D Analog multiplexing But a train with a heavy load could look like a faster train
24
24 More Answers Nonlinear amplifier? More complex than necessary Can be substituted for high gain amplifier in current system
25
25 Other Scope Plots Idle on track after amplifier Idle on track after rectifier / filter ~1 V
26
26 Other Scope Plots Running after amplifier Running after rectifier / filter Still variation,but always above ~7V -does not damage comparator -lower filter cutoff increases response time