Presentation is loading. Please wait.

Presentation is loading. Please wait.

9/2/04 Pratham Team Leader: Matt Ryan Chief Engineer: Gabe Letona Fabrication: Reed Langton CAD/CAM: Fraterno Vila Electronics/Control Engineer: Nick Martin.

Similar presentations


Presentation on theme: "9/2/04 Pratham Team Leader: Matt Ryan Chief Engineer: Gabe Letona Fabrication: Reed Langton CAD/CAM: Fraterno Vila Electronics/Control Engineer: Nick Martin."— Presentation transcript:

1 9/2/04 Pratham Team Leader: Matt Ryan Chief Engineer: Gabe Letona Fabrication: Reed Langton CAD/CAM: Fraterno Vila Electronics/Control Engineer: Nick Martin

2 9/2/04 Progress Mixed Drink Maker Mixed Drink Maker Too complicated Too complicated Time limitations Time limitations Not hand-held or easily moveable Not hand-held or easily moveable New idea: ‘Container’ Opener New idea: ‘Container’ Opener

3 9/2/04 Container Opener Concept Concept Open glass jars and plastic bottles without crushing the bottle or letting carbonated liquids “explode” Open glass jars and plastic bottles without crushing the bottle or letting carbonated liquids “explode” Reason for selection Reason for selection Opportunity to aid consumers with strength limitations, i.e. arthritis Opportunity to aid consumers with strength limitations, i.e. arthritis Within our skill set Within our skill set Handheld or mobile Handheld or mobile Easier to prototype and model Easier to prototype and model

4 9/2/04 Schedule Friday, September 10 Friday, September 10 Compare and discuss individual concepts memos Compare and discuss individual concepts memos Tuesday, September 14 Tuesday, September 14 Submit individual concept memos Submit individual concept memos Submit team preliminary concept Submit team preliminary concept


Download ppt "9/2/04 Pratham Team Leader: Matt Ryan Chief Engineer: Gabe Letona Fabrication: Reed Langton CAD/CAM: Fraterno Vila Electronics/Control Engineer: Nick Martin."

Similar presentations


Ads by Google