Presentation is loading. Please wait.

Presentation is loading. Please wait.

M2: Team Paradigm :: Milestone 8 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.

Similar presentations


Presentation on theme: "M2: Team Paradigm :: Milestone 8 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping."— Presentation transcript:

1 M2: Team Paradigm :: Milestone 8 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping Zhan

2 M2: Team Paradigm Team Paradigm

3 M2: Team Paradigm Project Status 18-525, Integrated Circuits Design Project Design Proposal (Done) Architecture Proposal (Done) Gate level Design(Done) Component Layout (DRC & LVS): (Done) Component Simulation: (Done) Component Layout (Done) Component Simulation (Done) Chip Layout (90%) TBD Chip Layout (Finished) Spice Simulation of Entire Chip Still Speed but also Reduction of size Design Goals

4 M2: Team Paradigm Masks for 1-D

5 M2: Team Paradigm Poly Top

6 M2: Team Paradigm Poly Bottom

7 M2: Team Paradigm M1 Top

8 M2: Team Paradigm M1 Bottom

9 M2: Team Paradigm M2 Top

10 M2: Team Paradigm M2 Bottom

11 M2: Team Paradigm M3 Top

12 M2: Team Paradigm M3 Bottom

13 M2: Team Paradigm M4 Top

14 M2: Team Paradigm M4 Bottom

15 M2: Team Paradigm 1ddct

16 M2: Team Paradigm 2DDCT :450 by 450 :Sorry yesterdays transistor count was only for the DCTs :Revised Transistor Count: 31484 Transistors :Density/Porosity: 0.155

17 M2: Team Paradigm ::conclusion & questions


Download ppt "M2: Team Paradigm :: Milestone 8 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping."

Similar presentations


Ads by Google