Detector Systems Update MICO Feb 25, 2008
2
MICE Detector Systems CKOV u CKOV installation planned during March shutdown u Cable issues resolved. Geneva shipping DSA-MLCR cables. to RAL u Cables routed by RAL personnel in coming weeks. u Table bracket design by Oxford. Waiting go-ahead for machining at Oxford. u Some work on environmental sensors and gas flushing hardware at UM. TOF0 u No Update Tracker u Cryo-system #4 for first tracker has now been replaced by system #2 due to a cool-down problem u Readout tests of AFEIIt boards continue. To date, functional readout of a full set of boards (8) has not been accomplished s Estimate for shipment to RAL has not changed. Calorimeter u KL s The additional iron shielding bars for KL has been built and the complete frame will be reassembled this week. u SW s No Update
3
Beam Monitors u Small Beam Monitor is complete and tested u Large Beam Monitor is nearing completion u Target is to ship equipment by 3/13 u Fermilab Team arrives at RAL on 3/24 for installation and commissioning
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.