Large Wheel Installation Helped with initial installation in 2005 Installed EML and EMS chambers in sector frame. Last chamber installed 31 October 2006 Diagnosed and developed procedure for fixing potential o-ring leaks in EMS chamber cut-outs. Scheduled replacement of EPDM with Viton o-rings.
2
Small Wheel Tooling for Phase 1.9 and Installation –Modify Rotator Cart, with Marta and C. Weaverdyck, for Photogrammetry and Installation (especially for EIL.2-3 chambers) –Use of Harvard lifting tool for de-crating BMC EI chambers –Create a Usage & Procedures manual, for above, and train dedicated personnel –Modify 20mm EM chamber verticalizer for use with 12 mm EI chambers Coordinate/Organize Phase 1.9 –Update and modify traveler tasks for EI chambers –Compile Phase 1 information for Phase 1.9 –Develop file structure for database update –Ensure integration of Boston temperature sensors Understand Small wheel installation in Building 191 –Space allocation and transport of chambers to 191 –Develop procedure and assemble crew for chamber installation Commissioning small wheel with cosmic rays
3
Other Tasks Helped Integrate new BU people at CERN Photograph and document activities in Building 180, 190 and 191 W cross section analysis, working with Di- boson group (Bing Zhou) Small wheel Commissioning –DAQ for EIS and EIL chambers –Integrate MDT with CSC and TGC trigger –Final cosmic ray analysis before/after installation Administer Barracks computer cluster
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.