1 UCSB Module Assembly Week of 5/2-5/6. 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu8517606722297247 L12pd0006722297247 L12su0006722297249.

Similar presentations


Presentation on theme: "1 UCSB Module Assembly Week of 5/2-5/6. 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu8517606722297247 L12pd0006722297247 L12su0006722297249."— Presentation transcript:

1 1 UCSB Module Assembly Week of 5/2-5/6

2 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu8517606722297247 L12pd0006722297247 L12su0006722297249 L12sd0006722297249 L34pu8517606722297~1050 L56p0152013924176~1050 R5N1630018pr209 pr52 pr38 R5S917018pr209 pr52 pr14 R66800109pr0264 R7000072pr0198

3 3 UCSB Module Assembly – Mech. Specs. Weekly Cumulative ABFABF% A or B L12pu0000000.00% L12pd0000000.00% L12su0000000.00% L12sd0000000.00% L34p00010820100.00% L56p54003385199.7% R5N0004020100.00% R5S2601571296.7% R69008190100.00% R70000000.00% Total890162419399.5%

4 4 UCSB Module Assembly Problems Past Week Overall assembly was fairly routine. We are regularly doing 6/day and if things are going smoothly 7/day is not a problem. A new person is being trained on the OGP so that the gantry/assembly technicians do not have to do surveys or module plating first thing in the morning.

5 5 Wirebonding This Week –Modules Bonded: 54 TOB SS6 18 R5S 18 R6 –Some problems with TOB PA’s, but overall bonding has been able to keep up with production on a daily basis.