RASRS Report to Operating Committee July 15, 2015 Milt Patzkowski, Vice-Chair Remedial Action Scheme W ESTERN E LECTRICITY C OORDINATING C OUNCIL
2
RASRS Scheme Reviews, April-May (11 Entities, 30 schemes) 2 W ESTERN E LECTRICITY C OORDINATING C OUNCIL LADWP Owens Valley WAPS approved with one action item Scattergood accepted as a LAPS WAPA Glen Canyon RAS scheme re-design reviewed and approved as a WAPS. Portland GE Round Butte WAPS. RASRS requested additional information for review at the July meeting NV Energy Falcon Transformer RAS agreed to re-classify this scheme as a normal Protection System, not a RAS
3
RASRS Scheme Reviews, April-May 3 W ESTERN E LECTRICITY C OORDINATING C OUNCIL BC Hydro 2L64 Overload RAS was accepted as a LAPS Cheekeye Area LAPS update on in-service status Forrest Kerr and Kemano RAS Operations December 10, 2014 event that included 2 RAS misoperations Design Standards for MOD Control and Indication discussed new design resulting from October 2013 RASERS discussion North Coast RAS, Stage II presentation accepted in satisfaction of action item 2 from November 2014 PG&E Pittsburg-Lakewood WAPS action item response from November 2014 was approved AESO MATL RAS timing change approved
4
RASRS Scheme Reviews, April-May 4 W ESTERN E LECTRICITY C OORDINATING C OUNCIL SCE Ivanpah Area RAS modifications accepted as a LAPS Whirlwind AA-Bank RAS: Expansion of Soleil Generating Station approved with one action item Centralized RAS (CRAS) – Nido-Segundo RAS Approved this first field application of SCE’s CRAS to a specific WAPS that combines El Segundo LAPS and El Nido WAPS. Big Creek / San Joaquin Valley RAS webinar review accepted WAPS modifications, subject to one action item APS North Gila RAS accepted as a Safety Net
5
RASRS Scheme Reviews, April-May 5 W ESTERN E LECTRICITY C OORDINATING C OUNCIL PacifiCorp Standpipe LAPS construction update on scheme approved in 2013 Huntington LAPS decommissioning was approved following construction of the Sigurd – Red Butte 345 kV line (July 2015)update on scheme approved in 2013 Sunnyside LAPS decommissioning was approved pursuant to CAP provisions during 2015 Path 18 LAPS update redundancy mitigations Goshen Area Load Shedding RAS discussed logic
6
RASRS Scheme Reviews, April-May 6 W ESTERN E LECTRICITY C OORDINATING C OUNCIL BPA Standard Line Loss Logic (LLL) upgrades status update reviewed Discussion of the Synchrophasor (SP) RAS Safety Net Project was approved Western Montana RAS incorporation of Libby Local RAS accepted as a LAPS West Montana (WM) RAS Logic Changes to five algorithms approved DC RAS Logic Changes for WM generator droppings, group arming and virtual line loss approved John Day-Marion LLL additions to DC RAS and AC RAS were approved. Central Ferry-Lower Monumental LLL Addition into the AC RAS was approved as a WAPS AC RAS algorithms additions and modifications added to the controllers for anticipated in-service in late 2015 and early 2016 (logic programmed, but out of service until in-service dates). Bonneville Powerhouse #1 local RAS scheme was accepted Conkelley Load Trip Local RAS removal from service was approved Bothell-SnoKing Local RAS removal approved
7
RASRS Scheme Reviews, July 6-8 preliminary schedule Pacific Gas &Electric, San Diego Gas &Electric Southern California Edison BC Hydro Bonneville Power Administration Alberta Electric System Operator Avista Portland General Electric 7 W ESTERN E LECTRICITY C OORDINATING C OUNCIL
8
NERC RAS New Definition NERC BOT approved the proposed new RAS definition in December and filed it with FERC on February 3. – http://www.nerc.com/FilingsOrders/us /Pages/NERCFilings2015.aspx http://www.nerc.com/FilingsOrders/us /Pages/NERCFilings2015.aspx The actual definition is a little over one page (shorter than BES!) 8 W ESTERN E LECTRICITY C OORDINATING C OUNCIL
9
NERC New RAS Standards The standard drafting team issued a draft standard for 21-day informal comment period closing on May 21. The SDT is updating the proposal on the basis of those comments. The SDT anticipates a July date for the first formal posting. 9 W ESTERN E LECTRICITY C OORDINATING C OUNCIL
10
Next RASRS Meeting November 16-18, 2015, Salt Lake City, UT (Typically) review about 30 schemes from 10 members Other RASRS business (such as the new NERC definition and draft standard) 10 W ESTERN E LECTRICITY C OORDINATING C OUNCIL
11
Remedial Action Scheme Reliability Subcommittee July 2015 Questions?