Download presentation
Presentation is loading. Please wait.
2
SAE Magnetics (H.K.) Ltd. Member of Group Company Background
3
History Establishment1980 Member of TDK 1986 DongGuan Plant 1990 ISO9002 Certificate 1993 ISO14000 Certificate 1999
4
Main Business Manufacturer of Magnetic Heads for Computer Hard Disk Drives
5
Manufacturing Metal-In-Gap (MIG), Thin Film, Magneto- Resistive (MR), Giant MR, etc.. Head Gimbal Assembly (HGA) Head Stack Assembly (HSA)
6
Quality Assurance is the only way to survive and prosper in business business Quality
7
Quality Objectives SAE works to achieve Total Customer Satisfaction SAE never ceases to improve our Quality SAE produces products with built- in Quality
8
Offices and Plants Hong Kong Dongguan, China California, USA SingaporePhilippineKorea
9
600 + Employees Design & Development, Prototype Engineering Research - Electrical/Magnetic, Mechanical, Process & Testing Engineering Hong Kong Office
10
DGN Plants Over 20,000 employees 4 Manufacturing Plants Mass production Mass production - heads per month over 10M heads per month
12
Industrial Training for student Real Life working experience To generate new idea for your Final Year Project Develop your future Career Development Opportunity to join SMART Development Program
13
Training Period: Jun 20 to Aug 16 Working Hour: 8 : 00am - 5 : 00pm (Mon - Fri) 8:00am - 2:00pm (Sat) 8:00am - 2:00pm (Sat) Arrangement Dormitory: SAE provided Transportation: SAE provided To & Fro ShenZhen & DongGang To & Fro ShenZhen & DongGang
14
Training Program - ISO 9000 & ISO 14000 Awareness Training - Plant Regulation Briefing - Handle department projects - Production Process Introduction
15
Training Program - Individual Project Presentation - Certificate Award - Regular meeting will HR & University representatives
16
DateEvent Jun 20Orientation Jun 21-23ISO Training & Production Process Introduction Jun 26 - Aug 13Department assigned Project Aug 14, 15Individual Presentation & Certificate Presentation Training Schedule
19
Focused and specific training to develop competent staff S pecific
20
M B O (Management By Objective) Clear objective on staff development
21
A chievement Achieve high standard of quality in training
22
R esult O riented Measure performance by result
23
T alent S A E Retain outstanding talent in S A E
24
S pecific M BO A chievement R esult Oriented T alent
25
Industrial Attachment Scheme Final Year Project in University Satisfy SAE Project Needs
26
Degree / Master Student After Graduate SMART Engineering Trainee Manager II / Principal Engineer II / Senior Engineer
27
SMART Development Program - Salary Increment depend on performance - Results Orientated Review on each Half Year - 5 years Development Program
29
Thank you !
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.