APD Connector Update 6/23/03 Ian Harnarine NICADD Weekly Meeting.

Similar presentations


Presentation on theme: "APD Connector Update 6/23/03 Ian Harnarine NICADD Weekly Meeting."— Presentation transcript:

1 APD Connector Update 6/23/03 Ian Harnarine NICADD Weekly Meeting

2 Phil is in the process of producing about 5 pairs of our connectors: APD Connector Update 6/23/03 Ian Harnarine We are not going to release the shroud for production until we have inspected the produced connectors after polishing.

3 APD Connector Update 6/23/03 Ian Harnarine Top Layer of PC Board:

4 APD Connector Update 6/23/03 Ian Harnarine Bottom Layer of PC Board:

5 APD Connector Update 6/23/03 Ian Harnarine To Do List: Inspect produced connectors and alter the shroud, if warranted. Work on perfecting the PC-Board design. Demand better food at the Blackhawk Cafeteria.