1 May 4, 2004Bill Wisniewski1 Installation Review

2 May 4, 2004Bill Wisniewski2 Charge ( W. Althouse, G. Bowden, W. Innes(chair), J.Weisend, (D. Nelson)) Installation of the LSTs in the IFR Barrel is less than three months away.Please evaluate the readiness of the team to perform this installation considering: design and production of the fixturing for steel removal and brass installation design and production of the fixturing for steel removal and brass installation production of the LST tubes and modules, their delivery, and status of their testing including plans for testing burn-in at SLAC production of the LST tubes and modules, their delivery, and status of their testing including plans for testing burn-in at SLAC production of the phi and Z strips production of the phi and Z strips construction of the gas system, hurdles to be passed before its use construction of the gas system, hurdles to be passed before its use

3 May 4, 2004Bill Wisniewski3 Charge (cont’d) production and testing of the high voltage system design, performance and production of front end electronics design, performance and production of front end electronics design and installation plan for the infrastructure related to system readout: cables, crates, racks, platforms design and installation plan for the infrastructure related to system readout: cables, crates, racks, platforms installation and testing of the installed LSTs (is test data accessible for comparison on installation?) installation and testing of the installed LSTs (is test data accessible for comparison on installation?) readiness of installation platforms and tooling; adequacy of pre- installation exercises readiness of installation platforms and tooling; adequacy of pre- installation exercises adequacy of safety planning (hazards analysis), oversight and monitoring adequacy of safety planning (hazards analysis), oversight and monitoring

4 May 4, 2004Bill Wisniewski4 Charge (cont’d) adequacy of manpower for the installation; identification and organization of that manpower progress in understanding the detailed installation schedule: interplay of mechanical work with commissioning progress in understanding the detailed installation schedule: interplay of mechanical work with commissioning Please give us a preliminary evaluation at a breakout session at the end of the review, and follow up with a short written report.