1 CIC NOC Update 2/04/11 Greg Redder redder@colostate.edu

2 Phase 1 buildings OT Clark C Shepardson ARBL Engineering A/Z VTH Atmos NESB

3 Budget Status Part numberDescriptionNumber For ProjectCostExtended PriceReceived First 9 CIC buildings + 3 extra sets J9642AHP E5406 zl Switch with Premium Software12$1,302$15,6241/28/11 J8705AHP ProCurve Switch 5400zl 20 Gig-T + 4 GBIC12$1,853$22,2421/28/11 J8713A#ABAHP ProCurve Switch 5400zl 1500W Power Supply24$669$16,0562/2/11 J4858CHP ProCurve Gigabit-SX-LC Mini-GBIC3$216$6471/28/11 J4859CHP ProCurve Gigabit-LX-LC Mini-GBIC18$463$8,3341/28/11 J4860CHP ProCurve Gigabit LH-LC Mini-GBIC3$2,950$8,8501/28/11 GLC-ZX-SM-NHRZX optics for Cisco3$550$1,650on order GLC-LH-SM-NHRLH optics for Cisco12$995$11,940on order GLC-SX-MM-NHRSX optics for Cisco3$500$1,500on order Misc fiber needsPatch cords, etc1$1000 Pending UPS needsPossibly 2 MDF UPS2$1500$3000Pending Misc switch cards5300 or 5400 parts1$4000 Pending Total$86,843 Remaining of $143,620$56,777

4 Pending budgetary needs Fiber UPS 1 Gig cards for existing MDF switches.

5 Timeframe Start work immediately on fiber infrastructure Start configuration of switches week of 2/7 Start switch installs first week of March Complete 9 buildings by end of Spring semester

6 Concerns that can affect order/timeframe Fiber infrastructure Power/UPS Cooling Rack space

7 Process Bring dual gig links in from core gear at Engineering and NESB. Attach these connections to new CIC switch. Connect CIC switch in front of current MDF switch and provide two gig links into existing building switch. Attach environmental controls, life-safety, video, alarms, cardkey to switch. Designate new CIC switch as “demark”

8 Phase 2 Research concerns, 10G needs, other…? Consider buildings connected at only 100M? Consider buildings not affiliated with a College or a specific “hub” (don’t have a “see xyz…” in bandwidth utilization column)? Consider buildings with bandwidth issues/concerns?