Download presentation
Presentation is loading. Please wait.
1
Stefan Moeller Exp. Areas Conventional Facilitiessmoeller@slac.stanford.edu October 24, 2005 1 Experimental Areas - Conventional Facilities Stefan Moeller
2
Stefan Moeller Exp. Areas Conventional Facilitiessmoeller@slac.stanford.edu October 24, 2005 2 Overview Experimental Areas: Near Experimental Hall (NEH) Utilities Support shops Far Experimental Hall (FEH) Final design Hutch layout
3
Stefan Moeller Exp. Areas Conventional Facilitiessmoeller@slac.stanford.edu October 24, 2005 3 Layout of Experimental Areas Redesign
4
Stefan Moeller Exp. Areas Conventional Facilitiessmoeller@slac.stanford.edu October 24, 2005 4 Near Experimental Hall Subbasement (tunnel level) 3 hutches, mirror area Adjacent control areas, support shops Basement level Laserbay (above hutches) Computer farm, shops
5
Stefan Moeller Exp. Areas Conventional Facilitiessmoeller@slac.stanford.edu October 24, 2005 5 Near Hall Sub-Basement Layout Wetlab Optics lab Electronic Shop Mech. Shop Hutch 1 Hutch 2 Hutch 3 Flipper Mirror Tank Area Electrical Tele
6
Stefan Moeller Exp. Areas Conventional Facilitiessmoeller@slac.stanford.edu October 24, 2005 6 NEH Sideview Hutches Laserbay 15ft Tunnel
7
Stefan Moeller Exp. Areas Conventional Facilitiessmoeller@slac.stanford.edu October 24, 2005 7 Near Hall Basement Layout offices Vac Shop Machine Shop Storage Computer Farm Laserbay
8
Stefan Moeller Exp. Areas Conventional Facilitiessmoeller@slac.stanford.edu October 24, 2005 8 Utilities Room Data Sheets Title 30% complete Review and Evaluation Mechanical (HVAC, temperature, cleanliness, gases, plumbing, exhaust) Electrical (power, lighting) ES&H (eyewash, showers, shielding walls, fire protection, drains) Special Req.: cable trays, crane, vibration, wall penetrations
9
Stefan Moeller Exp. Areas Conventional Facilitiessmoeller@slac.stanford.edu October 24, 2005 9 Near Hall Sub Basement
10
Stefan Moeller Exp. Areas Conventional Facilitiessmoeller@slac.stanford.edu October 24, 2005 10 Near Hall Basement N2 boil off station Gas bottle storage outside
11
Stefan Moeller Exp. Areas Conventional Facilitiessmoeller@slac.stanford.edu October 24, 2005 11 Far Experimental Hall New layout - one spacious cavern Flexible and large hutch layout Control areas and set up space Long access tunnel Support shops in “adjacent” building
12
Stefan Moeller Exp. Areas Conventional Facilitiessmoeller@slac.stanford.edu October 24, 2005 12 FEH Cavern 46ft 31ft
13
Stefan Moeller Exp. Areas Conventional Facilitiessmoeller@slac.stanford.edu October 24, 2005 13 FEH Layout Hutches 1,2,3 >30x30ft X-Ray Tunnel 20ft 212ft Access Tunnel 19ft, ~300ft long 46ft Control Area 1 Control Area 2 Control Area 3
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.