Download presentation
Presentation is loading. Please wait.
1
E166 Collaboration J.C. Sheppard SLAC, October, 2003 E166 Background Test Beamtime Request J. C. Sheppard
2
J.C. Sheppard SLAC October, 2003 E166 Collaboration Meeting E166 Background Test Beam Requirements
3
J.C. Sheppard SLAC October, 2003 E166 Collaboration Meeting E166 Background Test Run Script, 1
4
J.C. Sheppard SLAC October, 2003 E166 Collaboration Meeting E166 Background Test Run Script, 2
5
J.C. Sheppard SLAC October, 2003 E166 Collaboration Meeting E166 Background Test Run Script, 3
6
J.C. Sheppard SLAC October, 2003 E166 Collaboration Meeting E166 Background Test Run Summary ● Time early for installation: February 1, 2004 ● Time required for installation and non-beam check-out: 2 weeks ● Time required to conduct measurements: 9-18 shifts (?)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.