Presentation is loading. Please wait.

Presentation is loading. Please wait.

E166 Collaboration J.C. Sheppard SLAC, October, 2003 E166 Background Test Beamtime Request J. C. Sheppard.

Similar presentations


Presentation on theme: "E166 Collaboration J.C. Sheppard SLAC, October, 2003 E166 Background Test Beamtime Request J. C. Sheppard."— Presentation transcript:

1 E166 Collaboration J.C. Sheppard SLAC, October, 2003 E166 Background Test Beamtime Request J. C. Sheppard

2 J.C. Sheppard SLAC October, 2003 E166 Collaboration Meeting E166 Background Test Beam Requirements

3 J.C. Sheppard SLAC October, 2003 E166 Collaboration Meeting E166 Background Test Run Script, 1

4 J.C. Sheppard SLAC October, 2003 E166 Collaboration Meeting E166 Background Test Run Script, 2

5 J.C. Sheppard SLAC October, 2003 E166 Collaboration Meeting E166 Background Test Run Script, 3

6 J.C. Sheppard SLAC October, 2003 E166 Collaboration Meeting E166 Background Test Run Summary ● Time early for installation: February 1, 2004 ● Time required for installation and non-beam check-out: 2 weeks ● Time required to conduct measurements: 9-18 shifts (?)


Download ppt "E166 Collaboration J.C. Sheppard SLAC, October, 2003 E166 Background Test Beamtime Request J. C. Sheppard."

Similar presentations


Ads by Google