REMODECE 2. Project meeting WP4 Casper Kofod Meeting at ISR 24-25. Sep. 2007.

Similar presentations


Presentation on theme: "REMODECE 2. Project meeting WP4 Casper Kofod Meeting at ISR 24-25. Sep. 2007."— Presentation transcript:

1 REMODECE 2. Project meeting WP4 Casper Kofod CK@Energypiano.dk Meeting at ISR 24-25. Sep. 2007

2 2 Status on Monitoring PartnerWeeks monitoring Total profileHouseholds recorded Comments ISR-UC-PO2Yes, 10 min50 HH surveyed Enertech- FR4Yes, 10 min4720 air con. 4 months last summer, + Temp. (in and out) + Humidity. ISI-Fraunhofer-GE2Utilities data? 0 Energy Piano4-8Yes 0.Innovus equipment corrected SINTEF2 for 50 HH, 1 year 50 HH Previous data, 1 h 0Power Detective, Plus electric space and water heating Eneffect2Utililty data 0Power Detective. SEVEn2Utility data, 1h with and without electric heating 0 ?Enertech equipment. CRES2No23, DIACEAir con. Summer 2007. ARCE2Yes 0ONVM equipment ADENE e-ster2Utility data0Confidentiality of raw data

3 3 WP4 Report including 16 equipments Every equipment describes short by functionality, units, pictures, references, web site og prices Every equipment describes short by functionality, units, pictures, references, web site og prices Two equipments for standby consumption at installation Two equipments for standby consumption at installation 11 equipment don’t give a full solution but have to be combined with other systems 11 equipment don’t give a full solution but have to be combined with other systems 1 non-intrusivt system 1 non-intrusivt system 5 full solutions: Enertech, Watteco, Auit, Elec. Housekeeper and Innovus 5 full solutions: Enertech, Watteco, Auit, Elec. Housekeeper and Innovus

4 4 D8 Purpose The campaign concept of end-uses in focus The campaign concept of end-uses in focus - “old” countries - “old” countries - “new” EU-countries. - “new” EU-countries. Developed ID system to handle all measurements Developed ID system to handle all measurements Prepared guidelines for preparation of measurements, installation, data retrieval, quality control and repair of data. This include standby measurement. Prepared guidelines for preparation of measurements, installation, data retrieval, quality control and repair of data. This include standby measurement. Comparison of country campaigns. Comparison of country campaigns. Description of the campaigns per 12 countries. Description of the campaigns per 12 countries. Description of equipment used for measurements. Description of equipment used for measurements.

5 5 REMODECE Report D8

6 6 Description per country

7 7 Selection of 100 customers DK: Customers with ADSL Internet connection which reflected to advertisement DK: Customers with ADSL Internet connection which reflected to advertisement FR: Radio/Newspapers/Email advertisement – Participation to a home exhibition – circle of acquaintances FR: Radio/Newspapers/Email advertisement – Participation to a home exhibition – circle of acquaintances GE: Focus on househoulds with TV and computer equipment GE: Focus on househoulds with TV and computer equipment GR: Personal contacts GR: Personal contacts PT: Selected among the utility EDP consumers with remote meter reading. PT: Selected among the utility EDP consumers with remote meter reading.

8 8 Problems meet in the campaign Difficult to find households with the requested appliances (especially large TV screens) Difficult to find households with the requested appliances (especially large TV screens) Technical problem to monitor the total consumption from the electrical meter Technical problem to monitor the total consumption from the electrical meter Dataloggers unconnected (pulled out) by utility staff during the monitoring campaign Dataloggers unconnected (pulled out) by utility staff during the monitoring campaign Very sensitive lampmeters (Enertech)that do not work always. Very sensitive lampmeters (Enertech)that do not work always. Had often to make cluster monitoring instead of seperate end-use monitoring due to lack of equipment. Had often to make cluster monitoring instead of seperate end-use monitoring due to lack of equipment. First verion of new equipment had problem with radio contact between the home central and the metering units due to a software problem. First verion of new equipment had problem with radio contact between the home central and the metering units due to a software problem. In case the customers turn smart dimmers off with the switch instead of the remote control delivery of monitoing data may stop in case the units are far away from the control unit and thus have to perform chain communication (no problem if the customer has a new wireless wall controls but this is often not the case in an experiment in already existing installations. In case the customers turn smart dimmers off with the switch instead of the remote control delivery of monitoing data may stop in case the units are far away from the control unit and thus have to perform chain communication (no problem if the customer has a new wireless wall controls but this is often not the case in an experiment in already existing installations.


Download ppt "REMODECE 2. Project meeting WP4 Casper Kofod Meeting at ISR 24-25. Sep. 2007."