Commissioning needs K.Long. Machine start: Target ready to go Water leak: –In branch in trench serving D2, Q4 – Q6: Small leak exacerbated by header tank.

Similar presentations


Presentation on theme: "Commissioning needs K.Long. Machine start: Target ready to go Water leak: –In branch in trench serving D2, Q4 – Q6: Small leak exacerbated by header tank."— Presentation transcript:

1 Commissioning needs K.Long

2 Machine start: Target ready to go Water leak: –In branch in trench serving D2, Q4 – Q6: Small leak exacerbated by header tank running low –Now fixed Ready for shift this evening when ISIS gives stable beam

3 Issues: Network in MLCR: –Can reach machines in MLCR via MCE PC in R76 –Presently working on either: Resolving remaining issues; Improving my understanding of what is ready Electronic log book: –Too many times I have failed to reach it … –Under investigation Perhaps port to a machine local to (or in) the MLCR Daily checks: –Need to institute daily checks: Header-tank water and water system Target nitrogen –Ideal shift check-list task For the moment discharged by MOM


Download ppt "Commissioning needs K.Long. Machine start: Target ready to go Water leak: –In branch in trench serving D2, Q4 – Q6: Small leak exacerbated by header tank."