1
Project Gulfstream Curtis Christiansen Jordan Hodge Jordan Lyford Troy Mills Wilson Schreiber Project Gulfstream Curtis Christiansen Jordan Hodge Jordan Lyford Troy Mills Wilson Schreiber
2
Agenda Background Problem Statement Solution Statement System Overview Design Concepts o Mechanical o Electrical o Software Assignments Schedule Budget
3
Background Many barns that contain livestock require some method to contain the animal waste and make it easy to clean Wood shavings are typically spread to make cleanup easier
4
Problem Statement Wood shavings may make cleanup easier, but it is still tedious. The shavings still need to be collected and removed.
5
Solution Statement Our solution consists of Autonomously driven vehicle with a vacuum source to collect the material Spiraling navigation Material collection storage area, with an auger disposal Docking station for disposal (HomeBase)
6
System Overview Vacuum Pump Storage Bin Vacuum Hose Auger Out (when full & docked) Mobility Platform w/ Micro-controller and on-board power Collection Manifold Sensors A: HomeBase Receiver B: Bin Full Sensor C: Bin Empty Sensor D: Wheel Encoder E-F: Obstacle Sensors HomeBase Transmitter
7
System Overview - Navigation
8
Design Concepts - Mechanical
9
Current Design - Mechanical
10
Design Concepts - Electrical
11
Design Concepts - Power
12
Design Concepts - Navigation Software
13
Current Assignments Troy: Bin, Auger Hodge: Navigation, CAD Lyford: Vacuum, HomeBase software Curtis: Obstacle detection software, CAD, Scoop Wilson: Navigation, Bumper
14
Schedule Week 1 (8/30 - 9/3) o Brainstorming, Vacuum Testing, Sensor Bumper, MARV Wiring Week 2 (9/7 - 9/10) o MARV Training & Testing, Further concept development, Vacuum testing Week 3 (9/13 - 9/17) o MARV Navigation, Power systems, Vac. testing, Bin/Auger prototypes Week 4 (9/20 - 9/24) o MARV Nav., Bin construction, Implement nav. sensors, Vacuum testing Week 5 (9/27 - 10/1) o MARV Navigation, Bin construction, Mount vacuum and scoops Week 6 (10/4 - 10/8) o MARV Navigation, Implement bin sensors, Final mounting Week 7 (10/18 - 10/22) o Engineering Verification and Testing, Problem corrections Week 8 (10/25 - 10/29) o Engineering Verification and Testing, Problem corrections
15
Preliminary Budget Auger - $20 Vacuum Accessories - $40 Stock - $50 Fittings and Fasteners - $30 Bin - $25 Sensors - $60 Total - $225
16
Questions