Team Lightning Rod Conceptual Design Review Trevor Luke, Matt Holmes, Alex Shelanski, Matthew Dickinson, Chris Bennet, Jesse Ellison, and Sushia Rahimizadeh.

Similar presentations


Presentation on theme: "Team Lightning Rod Conceptual Design Review Trevor Luke, Matt Holmes, Alex Shelanski, Matthew Dickinson, Chris Bennet, Jesse Ellison, and Sushia Rahimizadeh."— Presentation transcript:

1 Team Lightning Rod Conceptual Design Review Trevor Luke, Matt Holmes, Alex Shelanski, Matthew Dickinson, Chris Bennet, Jesse Ellison, and Sushia Rahimizadeh Fall 2010 Rev A 08-23-10 9/16/10

2 Mission Overview The mission of Team Lightning Rod is to send Zeus, a cubic balloon satellite built from foam core and equipped with an electromagnetic generator, to an altitude of thirty kilometers. Zeus will harness the vibrational energy experienced during its ascent and descent. A microcontroller will measure the amount of energy the electromagnetic generator produces. By analyzing the data collected, we will determine if future spacecraft will be able to utilize vibrational energy as an additional alternative energy source.

3 Design

4 2-D Model

5 3-D Model

6 Management Trevor LukeTeam Leader Matthew DickinsonStructures Co-Head Alex ShelanskiTesting and Video Head Jesse EllisonElectronics Head Chris BennettStructures Co-Head Matt HolmesBudget Head Sushia RahimizadehProject Design/ Programming Head

7 Schedule Proposals and Presentations—Due 9/16 by 7:00 am Order Form for Hardware—Due 9/21 by Appointment Receive Supplies—9/24 Build Structure—9/24 to 10/1 Build First Generator—9/24 to 10/1 Completion of First Generator and Structure—10/2 Optimization of Generator—10/2 to 10/8 Structure Testing—10/2 to 10/8 Finalization of First Generator—10/9 Wiring of Satellite—10/10 to 10/15 Finalization of Structure—10/13 Second Generator Competed—10/13 Wiring Components Completed—10/16 Programming Satellite—10/17 to 10/22 Final Construction Completed—10/23 Final Testing—10/24 to 10/29 Project Finished—10/30 Buffer Week—10/31 to 11/5 Launch—11/6

8 Budget –Spending Limit $300 –Cost of Supplies$185 + shipping –Weight Limit850 g –Estimated Weight700 g

9 Worries Vibration generator failure Not enough vibration to create energy Glitches in the programming Component failure Generator breaking on impact The generator producing too much energy and lighting on fire, destroying everyone’s projects.