Michigan Highway Construction: Traffic Tangles Feb. 10 th 2006 By: Matt Helms, FreePress Columnist
2
Who’s Effected? About 648,000+ travelers per day If you travel: –I-696 and Northwestern Hwy 335,000 –M-14 80,000 –I-75 80,000 –I-96 153,000 –Southfield Freeway
5
Delays = Problems! Delays cause problems –Value of Time –Lost Wages –Lost Business Income Lengthy trips means less people want to travel
6
X-Y Axis plane
7
Vehicles Area of Highway (sq. mile)
8
Vehicles Area of Highway (sq. mile)
9
Vehicles Area of Highway (sq. mile)
10
Vehicles Area of Highway (sq. mile) S D
11
Vehicles Area of Highway (sq. mile) S D Constructio n takes over the road!
12
Vehicles Area of Highway (sq. mile) S D Smaller roads mean more congestion
13
Good or Bad? Construction means better roads in the future Construction means longer travel times now Does a little traffic congestion now mean easier driving later?
14
Vehicles Area of Highway (sq. mile) S D Potentially larger roads in the future is less traffic congestion
15
Notables Detroit Free Press Reed Saxon photo