Presentation is loading. Please wait.

Presentation is loading. Please wait.

FE Hybrid status Last preproduction Status Test summary Modifications since November design revue.

Similar presentations


Presentation on theme: "FE Hybrid status Last preproduction Status Test summary Modifications since November design revue."— Presentation transcript:

1 FE Hybrid status Last preproduction Status Test summary Modifications since November design revue

2 Hybrid Meeting January 2003 J.D.Berst U.Goerlach229/01/03 Prototypes Status 10 prototypes + 300 TOB hybrids ordered from CICOREL/HybridSA TOB UP 4 APV’s version –206 delivered up to now First 10 laminated on CF 16 laminated on ceramic delivered early December 80 more delivered end December 100 delivered yesterday –100 still to be manufactured

3 Hybrid Meeting January 2003 J.D.Berst U.Goerlach329/01/03 Prototypes Status Yield rather good –106 hybrids tested –100 functionnal ones –50 already delivered to CERN

4 Hybrid Meeting January 2003 J.D.Berst U.Goerlach429/01/03 Prototypes Status FHIT measurement summary –Power consumption I250 I125 –DCU measurement DCU slope V250 V125 Internal temperature Internal current source Hybrid temperature

5 Hybrid Meeting January 2003 J.D.Berst U.Goerlach529/01/03 FHIT Measurements mA NN TOB 4 APV’s

6 Hybrid Meeting January 2003 J.D.Berst U.Goerlach629/01/03 FHIT Measurements mA TOB 4 APV’s N N

7 Hybrid Meeting January 2003 J.D.Berst U.Goerlach729/01/03 FHIT Measurements mV/10k  V/cnt N N

8 Hybrid Meeting January 2003 J.D.Berst U.Goerlach829/01/03 DCU Measurements mV /2 N N

9 Hybrid Meeting January 2003 J.D.Berst U.Goerlach929/01/03 DCU Measurements mV DCU internal sensor @ ~25C ambientHybrid sensor @ ~25C ambient NN

10 Hybrid Meeting January 2003 J.D.Berst U.Goerlach1029/01/03 Modifications Since November Design Revue +0.3 mm Oblong hole Det return decoupling Solder mask modified TOB

11 Hybrid Meeting January 2003 J.D.Berst U.Goerlach1129/01/03 Physical Layout and Dimensions TOB references

12 Hybrid Meeting January 2003 J.D.Berst U.Goerlach1229/01/03 Modifications Since November Design Revue Oblong hole Det return decoupling +0.3 mm No holes in soldering pads Y aligned ref marks Solder mask modified TIB

13 Hybrid Meeting January 2003 J.D.Berst U.Goerlach1329/01/03 Physical Layout and Dimensions TIB references

14 Hybrid Meeting January 2003 J.D.Berst U.Goerlach1429/01/03 Modifications Since November Design Revue


Download ppt "FE Hybrid status Last preproduction Status Test summary Modifications since November design revue."

Similar presentations


Ads by Google